My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Presentation - Pavement Management Plan Update
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
07-01-25
>
Presentation - Pavement Management Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 10:19:30 AM
Creation date
8/15/2025 10:19:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINDINGS <br />1)There are currently 98 miles of city roadways . The city has added 27 miles of new streets since 2013. <br />2)The average condition rating for today’s streets is 89 (88.6). This represents a street network in very good to <br />excellent condition and has increased from 83 (82.7) in 2023. <br />3)The average PCI rating falls to 74.7 for streets with no curb. <br />4)88.0% of streets are in the “good” or “excellent” category and require only preventative maintenance. This is up <br />from 78.3% in 2023. <br />5)6.5% of streets are in the “fair” category and will require additional maintenance considerations, such as a Mill and <br />Overlay. <br />6)5.5% of streets are in the “poor” and “failing” categories, requiring a Full Depth Reclamation or complete <br />Reconstruction. This is down from 15.5% in 2023. <br />7)The later years of the CIP are based on pavement aging and reflect streets that are currently in good condition.
The URL can be used to link to this page
Your browser does not support the video tag.