My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#11 - Public Works Backup Generator
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
01-16-24
>
#11 - Public Works Backup Generator
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 12:18:31 PM
Creation date
8/19/2025 12:18:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />QUOTE <br /> Maintenance Repair Other 1/3/2024 <br />From: To : <br />Kodiak Power Systems Inc. Name Marty Powers <br />Power Generation Maintenance & Repair Company City of Lake Elmo <br />P.O Box 10555 Address 4259 Jamaca Ave N. <br />White Bear Lake, MN 55110 City Lake Elmo, MN <br />612-508-8424 Phone 651-248-7828 <br />mproulx@kodiakpowers ystems.com email MPowers@lakeelmo.org <br />Type of Quote Estimate Only Firm Price Time & Material <br />Site Name - Public Works Generator - Proposed Replacement <br />Salesperson Job Description <br />MJP Turn -Key Proposal - Quote Expiry March 3, 2024 <br />Item Qty Item Description $ Line Total <br />1 Generator <br />1 Cummins 100kw RS100 <br />System Voltage <br />1 277/480V 3 Phase <br />Transfer Switch <br />1 Use existing transfer switch <br />Accessories <br />1 Battery 4D Extreme Cold <br />1 Oil Heater Kit <br />1 Fuel Regulator <br />1 Extreme Cold-1500 Watt Heater <br />Electrical <br />1 Disconnect and remove old generator. Rewire new generator. Use existing <br />conduit and wire. <br />Fuel <br />1 Natural gas piping and connection. Run new line from gas meter over to <br />generator. <br />Misc. <br />1 Remove existing generator <br />Enclosure <br />1 Sound enclosure <br />Breaker Size <br />1 100 amp <br />Setting and Startup Services <br />1 Remove old generator and set new generator with crane <br />1 Generator startup, 2 hour load bank, and customer training <br />Sales Tax <br />1 Sales tax NOT included <br />
The URL can be used to link to this page
Your browser does not support the video tag.