WATER SUPPLY STRATEGIES – NEXT STEPSFEBRUARY 20, 2024  FOCUSENGINEERING, inc.RECOMMENDATIONS WELL 2 TREATMENT FOR PFAS1) Proceed with design phase engineering for an Anion Exchange (IX) TreatmentatWell2usingpaired 8-ft diameter steel pressure vessels within the existing buildingfootprint and raisedroof. The roof needs to be raised to accommodate the 15-ft. tall steel pressure vessels.2) Pretreatment for IX filtration is required. A pressure cartridge filter for iron and manganese(Fe/Mn) pretreatment is recommended.3) Secure a GrantAgreement Amendment to fund design phase engineering services.4) Obtain sampling and detailed testing of Well 2 for design purposes.5) Proceed with direct procurement of the treatment vessels/equipment for accelerated delivery.6) Operate Well 2 on emergency basis only through peak 2024 summer demands.We are notrecommending the trail er mounted rental filters for use in 2024.7) Initiate building modifications as early as Summer 2024 in preparationof treatmentequipment.8) Initiate Well 2 rehabilitation and pump replacement in Fall 2024.