My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-20 Council meeting -Water Supply Strategies (2)
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
02-20-24
>
2024-02-20 Council meeting -Water Supply Strategies (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 4:03:03 PM
Creation date
8/20/2025 4:02:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER SUPPLY STRATEGIES – NEXT STEPSFEBRUARY 20, 2024 FOCUSENGINEERING, inc.PROJECT DETAILSWELL 2 TREATMENT FOR PFAS1) Treatment capacity is 800 gpm. Limited by building and site footprint.2) Schedule. Treatment system to be online by Spring 2025, prior to peak water demands.3) Cost. $2.40 million. All equipment is by purchased (no rentals).4) Expected life of IX media between replacement is estimated at 2-4 years.5) Estimated IX media replacement costs, including wastewater and media disposal is $225,000per change-out ($150k media, $55k disposal, $20k labor).6) Expected service life of treatmentsystem equipment is 50+ years (repaint interior and exteriorof vessels every 20 years). The equipment has a salvage or resale value within the design life.7) Temporary IX treatment for PFAS at Well 2 is feasible. Permanent IX treatment for PFAS atWell 2 is dependent upon further evaluation and MDH approval for long-termuse of apressure cartridge filter for iron and manganese (Fe/Mn) pretreatment.
The URL can be used to link to this page
Your browser does not support the video tag.