Laserfiche WebLink
WATER SUPPLY STRATEGIES – NEXT STEPSFEBRUARY 20, 2024  FOCUSENGINEERING, inc.PROJECT DETAILSWELL 2 TREATMENT FOR PFAS1) Building modifications include process piping, fittings, valving andmeters; removal ofhydropneumatic tank, air compressor and associated small piping systems; replacement ofwest side exterior “knock-out” block wall; sealing the generator room grated windowopenings, installation of exterior wall insultation and unit heaters, and revision of accessdoors.2) Building modifications also include removal of the interior wall, raising the roof byincreasing the exterior wall heights, and pouring concrete pads for the steel vessels. A newdouble wide 16-ft. tall garage door would be installed.3) Chemical feed equipment modifications will be required .4) Electrical and control modifications will be required.5) Replacement back-up generator is recommended.6) Well rehabilitation and new well pump with a variable frequency drive (VFD) isrecommended.