My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-20 Council meeting -Water Supply Strategies (2)
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2024
>
02-20-24
>
2024-02-20 Council meeting -Water Supply Strategies (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 4:03:03 PM
Creation date
8/20/2025 4:02:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER SUPPLY STRATEGIES – NEXT STEPSFEBRUARY 20, 2024 FOCUSENGINEERING, inc.PROJECT DETAILSWELL 2 TREATMENT FOR PFAS1) Building modifications include process piping, fittings, valving andmeters; removal ofhydropneumatic tank, air compressor and associated small piping systems; replacement ofwest side exterior “knock-out” block wall; sealing the generator room grated windowopenings, installation of exterior wall insultation and unit heaters, and revision of accessdoors.2) Building modifications also include removal of the interior wall, raising the roof byincreasing the exterior wall heights, and pouring concrete pads for the steel vessels. A newdouble wide 16-ft. tall garage door would be installed.3) Chemical feed equipment modifications will be required .4) Electrical and control modifications will be required.5) Replacement back-up generator is recommended.6) Well rehabilitation and new well pump with a variable frequency drive (VFD) isrecommended.
The URL can be used to link to this page
Your browser does not support the video tag.