My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9-2-25 City Council Meeting Packet
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
9-2-25 City Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 11:37:19 AM
Creation date
9/2/2025 11:36:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Three Quotes were requested to complete the resurfacing of the east half of the Public Works Shop Floor. <br />One failed to propose the project as outlined and the two proposals meet the requirements and are as follows: <br />Contactors <br />Project <br />Cost <br />Greystone <br />$35,000 .0 <br />0 <br />Swede Bro <br />$3 1,600 .0 <br />0 <br />Surface Pro Rejected <br />FISCAL IMPACT: <br />Included in the 2025 CIP was $35,000 to complete the floor resurfacing of the east half of the Public Works <br />shop floor in 2025. Funding is split between the Water, Sewer, Stormwater Funds. The Second Phase will <br />be proposed in 2026 and is planned to be funded from the General Fund/Streets and parks. Swede Bro was <br />the lowest responsible bidder <br />RECOMMENDATION: <br />“Motion to approve contracting Swede Bros to resurface the east half of the Public Works shop floor <br />not to exceed $35,000” <br />ATTACHEMENTS: <br />Greystone Proposal <br />Swede Bro Proposal
The URL can be used to link to this page
Your browser does not support the video tag.