Three Quotes were requested to complete the resurfacing of the east half of the Public Works Shop Floor. <br />One failed to propose the project as outlined and the two proposals meet the requirements and are as follows: <br />Contactors <br />Project <br />Cost <br />Greystone <br />$35,000 .0 <br />0 <br />Swede Bro <br />$3 1,600 .0 <br />0 <br />Surface Pro Rejected <br />FISCAL IMPACT: <br />Included in the 2025 CIP was $35,000 to complete the floor resurfacing of the east half of the Public Works <br />shop floor in 2025. Funding is split between the Water, Sewer, Stormwater Funds. The Second Phase will <br />be proposed in 2026 and is planned to be funded from the General Fund/Streets and parks. Swede Bro was <br />the lowest responsible bidder <br />RECOMMENDATION: <br />“Motion to approve contracting Swede Bros to resurface the east half of the Public Works shop floor <br />not to exceed $35,000” <br />ATTACHEMENTS: <br />Greystone Proposal <br />Swede Bro Proposal