My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#04 - RFP for Land
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
03-07-23
>
#04 - RFP for Land
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:08:35 PM
Creation date
9/29/2025 1:06:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cyphers Logistic Park AUAR 60 March 2022 <br />however, the planned future road improvements will result in a cumulative benefit to traffic conditions. All other impacts from these future projects will be addressed via regulatory <br />permitting and approval measures; therefore, they will be individually mitigated to ensure no cumulative impacts occur to environmental and community resources . <br />20. Other Potential Environmental Impacts <br />If the project may cause any additional environmental effects not addressed by Items 1 to 19, <br />describe the effects here, discuss the how the environment will be affected, and identify measures that will be taken to minimize and mitigate these effects. <br />All known environmental effects are addressed in the preceding sections. <br />Mitigation Plan <br />This Mitigation Plan is submitted as part of the AUAR to provide reviewers and regulators with an <br />understanding of the actions that are advisable, recommended, or necessary to protect the environment and minimize potential impacts by the propose d development scenarios. <br />This Mitigation Plan is intended to satisfy the AUAR rules that require the preparation of a mitigation <br />plan that specifies measures or procedures that will be used to avoid, minimize, or mitigate the potential impacts of development within the AUAR s tudy area. Although mitigation strategies are <br />discussed throughout the AUAR document, this plan will be formally adopted by the RGU as their action plan to prevent potentially significant environmental impacts. <br />The primary mechanism for mitigation of environmental impacts is the effective use of ordinances, rules, and regulations. The plan does not modify the regulatory agencies’ responsibilities for <br />implementing their respective regulatory programs nor create additional regulatory requirements. The plan specifies the legal and institutional arrangements that will assure that the adopted <br />mitigation measures are implemented. <br />There were no impacts or mitigation strategies identified in Item 14 and Item 15; therefore, these areas are not included in the Mitigation Plan. The remaining AUAR items have identified regulatory <br />requirements and/or mitigation measures that reduce the level of potential impact of development within the AUAR study a rea. The following mitigation summary applies to Scenario 1, 2, 3, and 4 <br />unless otherwise specified. <br />Table 11: Permits and Approvals Required <br />Unit of Government Type of Application Status <br />Federal <br />U.S. Army Corps of Engineers Section 404 To be applied for, if applicable <br /> State <br />Minnesota Pollution Control Agency <br />National Pollutant Discharge <br />Elimination System Stormwater Permit for Construction <br />Activities <br />To be applied for <br />Sanitary Sewer Extension Permit To be applied for
The URL can be used to link to this page
Your browser does not support the video tag.