My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#04 - RFP for Land
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
03-07-23
>
#04 - RFP for Land
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:08:35 PM
Creation date
9/29/2025 1:06:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 NorthPoint Industrial Park – Lake Elmo, MN │Traffic Analysis <br />January 2022 <br />TABLE 3: AUAR DEVELOPMENT SCENARIOS <br />Full Development Scenario 1 <br />Land Use Size <br />Industrial Business Park 1,753,400 Square Feet <br />Commercial 91,500 Square Feet <br />Multifamily Residential Units 400 Dwelling Units <br />Full Development Scenario 2 <br />Land Use Size <br />Industrial Business Park 1,557,380 Square Feet <br />Commercial 178,596 Square Feet <br />Multifamily Residential Units 334 Dwelling Units <br />Single Family Residential Units 38 Dwelling Units <br />Full Development Scenario 3 <br />Land Use Size <br />Industrial Business Park 2,2 00,000 Square Feet <br />Commercial 91,500 Square Feet <br />Single Family Residential Units 56 Dwelling Units <br />Full Development Scenario 4 <br />Land Use Size <br />Industrial Business Park 1,100,000 Square Feet <br />Single Family Residential Units 10 Dwelling Units <br />For scenario s 1, 2, 3, and 4, the development south of 34th Street N was assumed to be fully built by the <br />Opening Year (2025). All four scenarios are expected to have the same development, 1,100,000 square <br />feet of industrial business park, in the Opening Year. Full development was assumed for all four scenarios <br />by Horizon Year (2040). The access locations are anticipated to be the same in all four scenarios. <br />4.4 TRIP GENERATION <br />Proposed development traffic was based on the Institute of Transportation Engineers’ (ITE) Trip <br />Generation, 11th Edition. The manual provides peak hour trips rates/equations , inbound -outbound <br />percentages, and truck percentages which were used to estimate the number of daily peak hour, and truck <br />trips that can be attributed to the undeveloped site. Based on a review of industrial land uses provided in <br />the manual, Land Use Code (LUC) 154 (High-Cube Transload and Short -Term S torage Warehouse), LUC <br />820 (Shopping Plaza >150ksf), LUC 821 (Shopping Plaza 40ksf -150ksf), LUC 210 (Single Family Detached <br />Housing), LUC 220 (Multifamily Housing Low-Rise), and LUC 221 (Multifamily Housing Mid -Rise ) were <br />determined to be the most appropriate fit for the proposed development. <br />LUC 154 was determined to most accurately reflect trip generation of typical NorthPoint industrial <br />d evelopment based on a study completed by Priority Engineers, Inc. in December 2019. The NorthPoint <br />Development Traffic Trip Generation Analysis is included in Appendix D. <br />Scenarios 1-4 all have the same phase 1 development. Table 4 provides a summary of trip generation for <br />development phase 1 of Scenarios 1-4. Based on the trip generation calculation, phase 1 development is <br />anticipated to generate 90 total trips during the AM Peak Hour (70 entering and 20 exiting), 110 total trips <br />during the PM Peak Hour (30 entering, 80 exiting), and 1,540 total daily trips.
The URL can be used to link to this page
Your browser does not support the video tag.