My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#04 - RFP for Land
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
03-07-23
>
#04 - RFP for Land
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:08:35 PM
Creation date
9/29/2025 1:06:44 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />NorthPoint Industrial Park – Lake Elmo, MN │Traffic Analysis <br />January 2022 <br />20 <br /> <br />TABLE 15: OPENING YEAR (2025) BUILD SCENARIOS 1-3 PM LOS SUMMARY <br />Intersection Control Approach <br />Operations by Movement Overall Intersection Left Through Right <br />Delay <br />(sec/veh) LOS Delay <br />(sec/veh) LOS Delay <br />(sec/veh) LOS Delay <br />(sec/veh) LOS <br />Ideal Avenue N & <br />34th Street N Signal <br />EB 44.2 D 18.2 B 4.4 A <br />23.4 C WB 52.1 D 17.9 B 2.6 A <br />NB 35.5 D 29.5 C 8.1 A <br />SB 29.6 C 46.9 D 10.7 B <br />Ideal Avenue N & <br />32nd Street N/Site <br />Access 2 <br />Side <br />Street <br />Stop <br />EB 17.3 C - - 5.2 A <br />17.3 C WB - - - - 14.6 B <br />NB 7.3 A 4.2 A 0.7 A <br />SB 10.9 B 6.6 A 5.8 A <br />Ideal Avenue N & <br />31st Street N/Site <br />Access 3 <br />Side <br />Street <br />Stop <br />EB 12.5 B - - 4.3 A <br />12.5 B WB 8.7 A - - 7.0 A <br />NB 5.0 A 1.8 A 1.8 A <br />SB 6.4 A 1.1 A 0.8 A <br />Ideal Avenue N & <br />Stillwater <br />Boulevard N <br />All - <br />Way <br />Stop <br />EB 9.6 A 14.3 B 3.9 A <br />11.1 B WB 9.2 A 14.3 B 5.8 A <br />NB 8.2 A 11.7 B 4.6 A <br />SB 14.0 B 16.7 C 4.4 A <br />34th Street N & <br />Jamaca Avenue N <br />Round- <br />about <br />EB 9.7 A 13.9 B 10.4 B <br />9.0 A WB 6.7 A 11.5 B 6.5 A <br />NB 4.0 A 7.8 A 3.5 A <br />SB 3.3 A 6.1 A 1.5 A <br />Ideal Avenue N & <br />36th Street N <br />Side <br />Street <br />Stop <br />EB 7.7 A - - 2.3 A <br />8.1 A WB 8.1 A - - - - <br />NB 4.0 A 1.5 A 1.8 A <br />SB - - 0.7 A 0.1 A <br />34th Street N & <br />Site Access 1 <br />Side <br />Street <br />Stop <br />EB - - 2.6 A 2.6 A <br />9.8 A WB - - 0.6 A - - <br />NB 9.8 A - - 6.2 A <br />SB - - - - - - <br />Based on the analysis, all study intersections are expected to operate at LOS C or better during the AM & <br />PM peak hours. Under Opening Year (2025) Build Scenario s 1-3, all intersection movements are <br />anticipated to operate at LOS D or better. It is not anticipated that a signal will be required at site access 1 <br />on 34th Street N, due to the anticipated trip generation and because all movements at site access 1 are <br />expected to operate acceptably . <br />The 95th percentile queues were reviewed at the study intersections. All 95th percentile queues for the <br />movements are anticipated to be accommodated within their respective storage bays, except the 95th <br />percentile queue of the northbound left turn at the intersection of 34th Street N & Ideal Avenue N which <br />extends approximately 20 feet past the provided storage bay. The anticipated queue will fit within the <br />existing taper. No mitigation is anticipated for the Opening Year (2025) Build Scenario 1 conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.