Laserfiche WebLink
<br />NorthPoint Industrial Park – Lake Elmo, MN │Traffic Analysis <br />January 2022 <br />28 <br /> <br />TABLE 23: HORIZON YEAR (2040) BUILD SCENARIO 2 PM LOS SUMMARY <br />Intersection Control Approach <br />Operations by Movement Overall Intersection Left Through Right <br />Delay <br />(sec/veh) LOS Delay <br />(sec/veh) LOS Delay <br />(sec/veh) LOS Delay <br />(sec/veh) LOS <br />Ideal Avenue N & <br />34th Street N Signal <br />EB 48.0 D 29.2 C 6.6 A <br />33.0 C WB 50.4 D 38.6 D 8.4 A <br />NB 38.8 D 33.4 C 14.7 B <br />SB 27.7 C 46.3 D 24.8 C <br />Ideal Avenue N & <br />32nd Street N/Site <br />Access 2 <br />Side <br />Street <br />Stop <br />EB 22.4 C - - 7.7 A <br />22.4 C WB - - - - 17.5 C <br />NB 8.0 A 6.0 A 0.7 A <br />SB 12.1 B 7.4 A 7.0 A <br />Ideal Avenue N & <br />31st Street N/Site <br />Access 3 <br />Side <br />Street <br />Stop <br />EB 20.5 C - - 5.8 A <br />20.5 C WB 15.1 C - - 7.7 A <br />NB 6.3 A 2.0 A 1.8 A <br />SB 5.9 A 1.2 A 0.9 A <br />Ideal Avenue N & <br />Stillwater <br />Boulevard N <br />All - <br />Way <br />Stop <br />EB 24.8 C 28.8 D 5.7 A <br />16.9 C WB 15.8 C 22.3 C 11.2 B <br />NB 15.7 C 19.4 C 6.4 A <br />SB 20.0 C 13.4 B 5.6 A <br />34th Street N & <br />Jamaca Avenue N <br />Round- <br />about <br />EB 40.4 E 45.9 E 43.5 E <br />32.5 D WB 37.2 E 40.6 E 40.0 E <br />NB 6.1 A 10.3 B 4.2 A <br />SB 5.2 A 7.2 A 1.8 A <br />Ideal Avenue N & <br />36th Street N <br />Side <br />Street <br />Stop <br />EB 17.5 C - - 6.5 A <br />18.7 C WB 18.7 C - - - - <br />NB 8.0 A 2.1 A 2.3 A <br />SB - - 1.5 A 0.3 A <br />34th Street N & <br />Site Access 1 <br />Side <br />Street <br />Stop <br />EB 11.8 B 4.1 A 3.6 A <br />61.0 F WB - - 1.2 A 1.4 A <br />NB 20.7 C - - 9.3 A <br />SB 61.0 F - - 48.8 E <br />Based on the analysis, all study intersections and intersection movements are expected to operate at LOS <br />C or better during the AM peak hour. Under Horizon Year (2040) Build Scenario 2 PM peak hour conditions, <br />all intersections and movements are anticipated to operate at LOS D or better except the following: <br />• 34th Street N & Jamaca Avenue N –The eastbound and westbound approaches are expected to <br />operate at LOS E. Th is is caused by increased east -west volume along 34th Street N nearing <br />capacity of the roundabout. <br />• 34th Street N & Site Access 1 – The overall intersection delay is reported as the worst individual <br />movement. The southbound left is anticipated to operate at LOS F and the southbound right is <br />anticipated to operate at LOS E. These delays are caused by increased east -west volumes and <br />only one exiting lane at the site access. <br />The 95th percentile queues were reviewed at the study intersections. All 95th percentile queues for the <br />movements are anticipated to be accommodated within their respective storage bays, except the 95th percentile queue of the northbound left turn at the intersection of 34th Street N & Ideal Avenue N which <br />extends approximately 70 feet past the provided storage bay. The queue is anticipated to fit within the existing taper. Required mitigation is consistent with Horizon Year (2040) conditions .