Laserfiche WebLink
<br />NorthPoint Industrial Park – Lake Elmo, MN │Traffic Analysis <br />January 2022 <br />30 <br /> <br />TABLE 25: HORIZON YEAR (2040) BUILD SCENARIO 2 MITIGATED PM LOS SUMMARY <br />Intersection Control Approach <br />Operations by Movement Overall Intersection Left Through Right <br />Delay <br />(sec/veh) LOS Delay <br />(sec/veh) LOS Delay <br />(sec/veh) LOS Delay <br />(sec/veh) LOS <br />Ideal Avenue N & <br />34th Street N Signal <br />EB 48.8 D 28.5 C 6.4 A <br />34.6 C WB 49.7 D 39.6 D 8.1 A <br />NB 46.8 D 31.2 C 19.4 B <br />SB 29.6 C 44.6 D 28.4 C <br />Ideal Avenue N & <br />32nd Street N/Site <br />Access 2 <br />Side <br />Street <br />Stop <br />EB 29.2 D - - 7.9 A <br />29.2 D WB - - - - 18.5 C <br />NB 7.8 A 6.2 A 0.8 A <br />SB 11.7 B 7.1 A 6.9 A <br />Ideal Avenue N & <br />31st Street N/Site <br />Access 3 <br />Side <br />Street <br />Stop <br />EB 16.5 C - - 5.9 A <br />16.5 C WB 15.0 B - - 8.1 A <br />NB 5.5 A 2.0 A 2.0 A <br />SB 5.5 A 1.2 A 0.9 A <br />Ideal Avenue N & <br />Stillwater <br />Boulevard N <br />All - <br />Way <br />Stop <br />EB 25.5 D 28.9 D 5.8 A <br />17.3 C WB 17.2 C 22.3 C 11.5 B <br />NB 16.0 C 21.2 C 6.2 A <br />SB 20.4 C 12.9 B 5.5 A <br />34th Street N & <br />Jamaca Avenue N <br />Round- <br />about <br />EB 5.5 A 8.9 A 4.2 A <br />7.4 A WB 6.8 A 9.6 A 3.3 A <br />NB 7.5 A 10.9 B 4.3 A <br />SB 4.5 A 7.6 A 1.9 A <br />Ideal Avenue N & <br />36th Street N <br />Side <br />Street <br />Stop <br />EB 19.5 C - - 6.5 A <br />19.5 C WB 17.2 C - - - - <br />NB 7.8 A 2.3 A 2.2 A <br />SB - - 1.4 A 0.2 A <br />34th Street N & <br />Site Access 1 <br />Side <br />Street <br />Stop <br />EB 10.0 A 3.6 A 2.9 A <br />24.7 C WB - - 1.4 A 1.5 A <br />NB 18.1 C - - 9.7 A <br />SB 24.7 C - - 9.1 A <br />Based on the analysis, all study intersections are expected to operate at LOS D or better during the AM & <br />PM peak hours. Under Opening Year (2025) Build Scenarios 1-3, all intersection movements are <br />anticipated to operate at LOS D or better. 34th Street N & site access 1 has acceptable side street delays <br />with the addition of dedicated turn lanes on the side streets in the peak hours, but the intersection should <br />be monitored as development occurs to determine if a signal is required. <br />The 95th percentile queues were reviewed at the study intersections. All 95th percentile queues for the <br />movements are anticipated to be accommodated within their respective storage bays, except the 95th <br />percentile queue of the northbound left turn at the intersection of 34th Street N & Ideal Avenue N which <br />extends approximately 120 feet past the provided storage bay in the pm peak hour. If these volumes are <br />realized, it may be necessary to restripe the northbound approach to include a longer storage capacity, <br />however it is anticipated this can be done within the existing cross section. <br /> <br />