My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#05 - 9450 Hudson Blvd. Development Agreement
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
03-21-23
>
#05 - 9450 Hudson Blvd. Development Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:19:29 PM
Creation date
9/29/2025 1:19:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />LA515-110-838683.v10 <br />provide adequate field inspection personnel to assure an acceptable level of quality control to the <br />extent that the Developer's engineer will be able to certify that the construction work meets the <br />approved Plans, the City approvals, the City Code, the City’s Engineering Design and <br />Construction Standards Manual, and the City’s Landscape and Irrigation Standards as a condition <br />of City acceptance. In addition, the City may, at the City’s discretion and at the Developer’s <br />expense, have one or more City inspectors or a soil engineer inspect the Developer’s work on a <br />full or part-time basis. The Developer's engineer shall provide for on-site project management. <br />The Developer's engineer is responsible for design changes and contract administration between <br />the Developer and the Developer's contractor. <br /> 7. CITY ADMINISTRATION AND CONSTRUCTION OBSERVATION. At the time of the <br />City’s approval of the final plat for the Subdivision, the Developer shall submit to the City an <br />amount to be escrowed by the City for City administration and construction observation costs in <br />an amount provided under paragraph 32 of this Agreement - Summary of Security Requirements. <br />Thereafter, the Developer shall reimburse the City each month, within 30 days of receiving an <br />invoice, following submission of an invoice to the Developer, for all administration and <br />construction observation costs incurred by the City during the construction of the Subdivision <br />Improvements by the City’s engineering, public works, planning, and landscape architecture staff <br />and consultants. After 30 days of the invoice, the City may draw upon the escrow and stop work <br />on the site until the escrow has been replenished in its full amount. City administration and <br />oversight will include monitoring of construction progress and construction observation, <br />consultation with the Developer and the Developer’s professionals on status or problems <br />regarding the project, coordination for testing, final inspection and acceptance, project monitoring <br />during the warranty period, and processing of requests for reduction in the Security. Construction <br />observation shall include, at the discretion of the City, part- or full-time inspection of proposed <br />public utilities and street construction. The City will bill for the services on an hourly basis.
The URL can be used to link to this page
Your browser does not support the video tag.