Laserfiche WebLink
ΔCABXSSSSMHRE=965.67CABXCBRE=964.9612" FES ()INV=962.35 ()CABXTNH18" FES ()INV=966.56 ()18" FES ()INV=967.75 ()SSSSMHRE=964.05INV=955.56 (12" PVC-NW)INV=955.56 (12" PVC-NE)18" FES ()INV=972.71 ()18" FES ()INV=974.05 ()CBRE=991.08CBRE=991.08STSTMHRE=991.07CBRE=986.72INV=981.87 (18" -)HYD58" X 36" ARCH PIPE FESINV=981.5047" FES ()INV=991.21 ()DRAINAGE AND UTILITY EASEMENT PER DOC. NO. 3963744DRAINAGE AND UTILITY EASEMENT PER DOC. NO. 3963744(TRUNK HIGHWAY NO. 12)INTERSTATE HIGHWAY NO. 94HU <br />D <br />S <br />O <br />N <br /> <br /> <br /> <br />B <br />L <br />V <br />D <br />.WEST LINE OF THE WEST 1/2 OF THE SE 1/4 OF THE SE 1/4, SEC. 34, TWP. 29, RNG. 21.SOUTH LINE OF THE WEST 1/2 OF THE SE 1/4 OF THE SE 1/4, SEC. 34, TWP. 29, RNG. 21.CM PROPERTIES 94 LMTD PARTNSPPID: 3402921440019(COMMERCIAL ZONING)ALWIN CHILDREN LLCPID: 3402921430006(COMMERCIAL ZONING)CONTINENTAL 483 FUND LLCPID: 3402921440012(RESIDENTIAL/PUD ZONING)PID: 3402921440004HIGHWAY EASEMENT PER DOC. NO. 90695ACCESS CONTROL PER DOC. NO. 613150Pu <br />b <br />l <br />i <br />c <br /> <br /> <br />S <br />t <br />r <br />e <br />e <br />tHIGHWAY EASEMENT PER MNDOT ROW MAP 12-46HUDSON <br /> <br /> BLVD <br />.Publi <br />c <br /> <br /> S <br />t <br />ree <br />t <br />B-8B-7B-6B-9B-10B-11B-13B-12RETAINING WALL-GRAVEL-WETLAND #1XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX77X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />XBITUMINOUS10POWERPOLE10WATERMAIN10FORCEMAIN10OVERHEADELECTRIC10 <br />GASMAIN10GASMAIN10WATERMAIN10SANITARYSEWER10STORMSEWER10FORCEMAIN10WATERMAIN10OVERHEADELECTRIC10GASMAIN10FIBER10SANITARYSEWER10HYDRANT10CURB &GUTTER10BITUMINOUS10POWERPOLE10GRAVEL1314POWERPOLE14POWERPOLEOVERHEADELECTRIC14OVERHEADELECTRIC14SIGN10SIGN101720GATEVALVE1019CABLEBOX10CABLEBOX1018891910897WATERMAIN10STORMSEWER10STORMSEWERCURB &GUTTER107STORMSEWER10721PROJECT NUMBER:DRAWING TITLEELECTRIC AUTOSALES & SERVICEHUDSON BLVD N.LAKE ELMO, MN 55042SHEET NUMBER©DENVER, CO 80209www.drakeres.comTel. 303.825.6200496 S. BROADWAYDRAKEMOTOR PARTNERS VANCOUVER, LLCAUG. 29, 2022 CITY SUBMITTALDRS22002I hereby certify that this plan was prepared by me, or under my direct supervision, andthat I am a duly Licensed Professional Engineer under the laws of the state ofMINNESOTA.Signature shown is a digital reproduction of original. Wet signed copy of this plan on file atLandform Professional Services, LLC office and is available upon request.Tom O. MeyerLicense No:Date:105 South Fifth AvenueSuite 513Minneapolis, MN 55401Tel: 612-252-9070Fax: 612-252-9077Web: landform.netLandform®and Site to Finish®are registered service marks of Landform Professional Services, LLC.OCT. 26, 2022 REVIEW SETJAN. 25, 2023 PRELIM BID SETFEB. 13, 2023 CITY SUBMITTALBackground information shown is from survey by Landform, Minneapolis, MN, on July 19, 2022, expressly for this project; City ofLake Elmo, MN record drawings; and utility service providers. Landform offers no warranty, expressed or written, for informationprovided by others. Existing project conditions shall be verified prior to beginning construction. Errors, inconsistencies, or omissionsdiscovered shall be reported to the Engineer IMMEDIATELY.Geotechnical boring locations are approximate and are based on information provided in the Geotechnical Report prepared byAmerican Engineering Testing, Albertville, MN, on August 1, 2022.1.2.EXISTING CONDITIONSNORTH0 50 100HUDSON BOULEVARDEXISTING CONDITIONS &DEMOLITIONC5.1:Curb Removal:Tree Removal: Mill Bituminous:Tree To Be Protected and Transplanted:Tree ProtectionSee Landscape Plan (L2.1) for Relocation:Soil BoringB-XObtain permits for demolition, clearing, and disposal prior to beginning.Contact utility service providers for field location of services 72 hours prior to beginning demolition and clearing.See Sheet C3.1 for erosion prevention and sediment control measures that must be in place prior to disturbances to site.Reserved.Dimensions shown for removal are approximate. Coordinate with new construction to ensure appropriate removal of existing facilities.Pavement sawcut. Remove concrete walks and curbing to the nearest existing joint beyond construction limits.Complete demolition with minimal disruption of traffic. Coordinate lane closures with the regulatory authority and provide advancenotification to affected emergency response providers.Provide barricades, lights, signs, traffic control, and other measures necessary for protection and safety of the public and maintainthroughout construction.Protect structures, utilities, trees, plant material, sod, and adjacent property from damage during construction unless noted forremoval. Damage shall be repaired to equal or better condition at no additional cost.Reserved.Refer to tree preservation plan for additional information.Remove existing site features including, but not limited to, underground utilities, paving, curbing, walkways, aprons, relatedfoundations, signage, and landscaping within the construction limits unless noted otherwise.Coordinate removal, relocation, termination, and re-use of existing private utility services and appurtenances with the utilitycompanies. Restore electric handholes, pullboxes, powerpoles, guylines, and structures disturbed by construction in accordance withutility owner requirements.Existing piping and conduits may be abandoned in-place if filled with sand and if not in location of proposed building or in conflict withproposed utilities or structures. Terminate existing services at the supply side in conformance with provider's standards.Haul demolition debris off-site to a facility approved by regulatory authorities for the handling of demolition debris, unless notedotherwise.Mill 2" of bituminous surface. Provide a clean vertical edge at connection to existing streets. Refer to Sheets C5.4 and C5.5 foradditional information.Remove existing pavement markings necessary for proposed layout. Follow MnDOT specifications for removal. Refer to Sheet C5.2for proposed striping.Protect structure. Replace casting with Neenah R-1642Remove, salvage, and re-install existing hydrant. See sheet C4.2 for install location.Remove, salvage, and reinstall existing arch storm pipe. Refer to Utility Plan for proposed location.2.3.4.5.6.11.12.15.16.GENERAL NOTESLEGENDDEMOLITION AND CLEARING NOTESFor construction staking and surveying services contact Landform at 612.252.9070.1.:Utility Line RemovalXXXXXXXXXXXXXXXXXXXXXX:Pavement Sawcut78910141317: Full Depth Pavement Removal18192021