My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#12 - Landucci Twinhomes Preliminary Plat and PUD
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
03-21-23
>
#12 - Landucci Twinhomes Preliminary Plat and PUD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:24:12 PM
Creation date
9/29/2025 1:23:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE 4 of 4 <br />requirements at low points. Any exceptions must be specifically called out and shown in a storm sewer <br />structure table for city review. <br />10. The maximum curb run prior to a catch basin is 350 feet. <br />11. Revise the plans to revise all HDPE storm sewer pipe with city standard required RCP storm sewer pipe. <br />12. Revise the Outfall storm sewer pipe to meet the city standard 15‐inch minimum pipe size. <br />13. Per city requirements all storm sewer pipe easements must be a minimum 30‐feet in width. <br />14. Revise the erosion control plans to show double silt fence around all BMPs. The use of bio rolls for BMPs <br />or site perimeter erosion control is not permitted. <br /> <br />MUNICIPAL WATER SUPPLY <br />1. Municipal drinking water is available to the site with a connection to an existing 8‐inch watermain stub <br />located along 39th Street North. <br />2. The developer will be responsible to extend municipal water into the development at the developer’s sole <br />cost with the extension of an 8‐inch DIP watermain. This extension is shown on the plans as a 590‐foot <br />watermain that dead ends with a hydrant at the end of the proposed cul‐de‐sac. <br />3. No watermain oversizing is applicable for this development and the watermain does not need to be <br />extended to serve adjacent properties or looped to connect at Stillwater Boulevard or Sunflower Drive. <br />4. The developer will be responsible to place hydrants and water system valves internal to the site as <br />determined by the Lake Elmo Public Works Director and Fire Department. <br />5. Minimum 30‐foot easements centered over the pipe/hydrant will be required when not located within <br />the public right‐of‐way. Easements must be free from all encroachments, including retaining walls, trees, <br />other small/dry utilities, or storm water management BMPs. Easements must be dedicated to the city as <br />part of the plat. Dedicated watermain easements must be shown on all site, grading, utility, and <br />landscape plans when submitting a Preliminary and Final Plat application. <br />6. The plans must be revised such that all water/sewer services are installed perpendicular to the main with <br />no bends. When the use of bends are unavoidable, they must be located outside of the paved street. <br /> <br />MUNICIPAL SANITARY SEWER <br />1. The proposed site is located in the Old Village MUSA area in the city’s Comprehensive Plan and will <br />discharge to the MCES Cottage Grove Ravine Interceptor. <br />2. Sanitary sewer service is available to the site with a connection to an existing 8‐inch sanitary sewer stub <br />located along 39th Street North. <br />3. The developer will be responsible to extend sanitary sewer service into the development at the <br />developer’s sole cost with the extension of an 8‐inch PVC sanitary sewer main. <br />4. No sanitary sewer oversizing is applicable for this development and the sewer does not need to be <br />extended to serve adjacent properties. <br />5. The plans must be revised such that all water/sewer services are installed perpendicular to the main with <br />no bends. When the use of bends are unavoidable, they must be located outside of the paved street. <br />6. All public sanitary sewer mains placed within the development will require minimum 30‐foot easements <br />centered over the pipe and be dedicated to the city as part of the final plat, if not located within a public <br />right‐of‐way. Dedicated utility easements must be shown on all site, grading, utility, and landscape plans, <br />and remain free from encroachments, including retaining walls, trees, or other small/dry utilities. <br /> <br />LANDSCAPE IMPROVEMENTS <br />1. Revise the landscape plans to remove all conflicts with storm water pond maintenance access routes and <br />emergency overflow pathways.
The URL can be used to link to this page
Your browser does not support the video tag.