My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#13 - Landscaping Requirements Top Soil
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
03-21-23
>
#13 - Landscaping Requirements Top Soil
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:24:44 PM
Creation date
9/29/2025 1:24:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of St. Louis Park TURF ESTABLISHMENT <br />2020 Page 6 of 7 <br /> <br />904.1 SEED <br />The contractor is responsible for the warranty of all seed installation. The warranty period for <br />Seeded areas is 45 growing days. Water within one day after areas have been seeded. Apply water <br />at a rate that prevents any damage to hydro-mulch, erosion blanket, and so that no runoff should <br />occur from the seeded areas. <br />Supply water to seed daily for the first 15 calendar days at a rate to keep soil surface moist. For <br />the remainder of the 30 calendar days, water seeded areas as needed to provide one (1) inch per <br />week. The warranty period is suspended at freeze up and resumes April 15th. <br />During the warranty period, contractor shall repair seeded areas that have dried, died, that have <br />been damaged, displaced, or weakened or is infested with over 40 percent of invasive species and <br />does not have the desired outcome. <br />Prior to the expiration of warranty period, the Engineer will inspect the seeded areas to determine <br />if the seeded areas have established a uniform 70 percent or greater vegetative cover. If the <br />uniform 70 percent or greater cover has not been established, the contractor is responsible for any <br />and all maintenance and repairs necessary to achieve the uniform cover at no additional cost to <br />the City. <br />904.2 SOD <br />The contractor is responsible for the warranty of all sod installation. The warranty period for sod <br />is 35 growing days. New sod must be watered within four hours of placement. Apply water at a <br />rate that prevents any damage to sod, minimizes runoff, and keeps the sod moist. The sod should <br />be watered a minimum of twice per day for the first 10 days and a minimum of once per day <br />beyond the first 10 days. The contractor must maintain a log of the watering which shows the <br />date, time, and amount of water which was used. This log must be provided to the engineer upon <br />request. <br />Failure to water the sod within 4 hours of placement or less than the minimum number of <br />occurrences as provided above will result in a $500 penalty per occurrence. <br />During the warranty period, the contractor shall repair sodded areas that have dried, died, that <br />have been damaged, displaced, or weakened or is infested with over 30 percent of invasive <br />species and does not have desired outcome. <br />Prior to the expiration of the warranty period, the Engineer will inspect the sodded areas to <br />determine if the Contractor has established a uniform growth. If the uniform growth has not been <br />established, the contractor is responsible for any and all maintenance and repairs necessary to <br />achieve the uniform growth at no additional cost to the City. <br /> <br />905.0 METHOD OF MEASUREMENT AND BASIS OF PAYMENT <br />All other work under this section is incidental to the contract for this section unless specifically listed <br />in the Special Conditions. The basis of measurement and payment shall be as follows: <br />905.1 FERTILIZER TYPE 3 <br />Payment for Fertilizer shall be by the weight of each type applied. If the Contractor provides <br />fertilizer with different type than as shown on the plans, the Engineer will adjust the application
The URL can be used to link to this page
Your browser does not support the video tag.