My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#13 - Landscaping Requirements Top Soil
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
03-21-23
>
#13 - Landscaping Requirements Top Soil
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:24:44 PM
Creation date
9/29/2025 1:24:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of St. Louis Park TURF ESTABLISHMENT <br />2020 Page 7 of 7 <br /> <br />rate of the fertilizer provided to meet the equivalent type proportions of the fertilizer shown on <br />the plans. <br />905.2 __________ TOPSOIL BORROW (LV) <br />Payment for “____________ Topsoil Borrow” shall be by the cubic yard. If the topsoil fails to <br />meet the requirements of the testing, and no suitable replacement material is found, a reduction of <br />10% will be applied to the Topsoil Borrow item in the Proposal. Unit prices in the Proposal shall <br />prevail with no adjustment being made due to an increase or decrease in quantities. <br />905.3 SEED <br />Payment at the unit price for “Seed” shall be by the acre as measured by the disturbed area. <br />Measurement and payment shall be full compensation for all materials, delivery, ground <br />preparation, placement, debris and rock removal, rolling, specified maintenance, coordination and <br />associated work complete and in place. <br />The City will pay up to 60 percent of the contract unit price for each seed, hydro-mulch, and net <br />free erosion blanket until the seeded areas have achieved a uniform 70 percent or greater <br />vegetative cover. <br />The City will pay up to 95 percent of the contract unit price for each seeded area that has been <br />accepted by the engineer. <br />905.4 SODDING TYPE LAWN <br />Payment at the unit price for “Sodding Type Lawn” shall be by the square yard of sod as <br />measured in place. Measurement and payment shall be full compensation for all materials, <br />delivery, ground preparation, placement, cutting in edges, rolling, staking, specified maintenance, <br />coordination and associated work complete and in place. <br />The City will pay up to 60 percent of the contract unit price for each sodded area during the <br />warranty period. <br />The City will pay up to 95 percent of the contract unit price for each sodded area that has been <br />accepted by the engineer. <br />905.5 WATER (TURF ESTABLISHMENT) <br />Payment for “Water (Turf Establishment)” shall be by the M gallons. The Unit prices in the <br />Proposal shall prevail with no adjustment being made due to an increase or decrease in quantities. <br />Water paid for under this item will be used only on this Contract for Turf Establishment. <br />905.6 HYDROSEED <br />Payment at the unit price for “Hydroseed” shall be by the square yard of seeded area as measured <br />in place and payment shall be based at the contract unit price. Measurement and payment shall <br />include all materials, delivery, ground preparation, seeding, rolling, hydromulch, specified <br />maintenance, coordination and associated work complete and in place. <br />905.7 NET FREE EROSION CONTROL BLANKET <br />Net free erosion control blankets shall be measured by the square yard that has been installed.
The URL can be used to link to this page
Your browser does not support the video tag.