My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#15 - CEF Solar Farm CUP
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
04-04-23
>
#15 - CEF Solar Farm CUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:27:43 PM
Creation date
9/29/2025 1:26:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />INTRODUCTION <br />The CEF Lake Elmo Community Solar Project (the “Project”) is <br />a proposed solar photovoltaic (“PV”) project with a maximum <br />size of 1,000 kilowatts (“KW”) alternating current (“AC”) and is <br />owned by CEF Lake Elmo Community Solar, LLC (“Applicant”), <br />a wholly-owned subsidiary of OneEnergy Development, LLC. <br />The Project is proposed to be located at 10755 50th St N, Lake <br />Elmo, MN 55042. The Applicant has a Solar Energy Option <br />Agreement to lease up to 10 acres with the Manzara family to <br />enable construction and operations of the project. The Project’s <br />proposed area of development (“Site”) will occupy up to <br />approximately seven (7) acres as shown in Figure 1 below. <br />AT A GLANCE: <br />CEF LAKE ELMO <br />COMMUNITY SOLAR <br />PROJECT <br />AREA 7 acres <br />SITE <br />CONTROL <br />3 year option for a 26- <br />year lease with 10- <br />year extension option <br />SYSTEM SIZE 1 MW-AC/1,000 KW- <br />AC <br />SYSTEM <br />TYPE <br />Single-axis <br />tracking Solar <br />Photovoltaic <br />PROJECTED <br />OUTPUT ~2,300 MWh / Year <br />ESTIMATED <br />ONLINE <br />DATE 2022 <br />Figure 1. Project Area
The URL can be used to link to this page
Your browser does not support the video tag.