Laserfiche WebLink
<br /> <br />5 <br /> <br />measured along the East line) thereof. Excepting therefrom the North 290.4 feet of the <br />East 750 feet of the West 850 feet of said East Half of the Northeast Quarter, according <br />to the United States Government Survey thereof and situate in Washington County, <br />Minnesota. <br />The Applicant has an Option to Lease the Property, which is provided in redacted form at <br />Appendix A. <br />LAND USE AND CHARACTERISTICS <br />The Property has historically been used for agricultural purposes. A single family detached home <br />was build on the western portion of the property in 1986. Currently the property continues to be <br />used primarily for cultivated agriculture and as a residence. Site elevations range from <br />approximately 930 to 950 feet above mean sea level. Photos of the current site conditions are <br />included as Appendix A. <br />NEARBY LAND USE <br />Nearby properties are zoned RR and are primarily of residential and agricultural use. However, <br />the Halcyon Cemetery is also located adjacent to the Project. <br />PROJECT DESCRIPTION <br />This Application is for a Conditional Use Permit to construct a 1 megawatt solar PV project on <br />approximately 7 acres of land. The Project will be constructed on land currently used for <br />agriculture. No wetlands, forests, or biologically sensitive areas will be impacted by the Project. <br />The Project will not produce any adverse impacts on surrounding properties, as it has been <br />designed to avoid percebtable glare and noise, will not generate traffic or emmissions once built. <br />Additionally, the Project will not place any new burdons on City infrastructure, as no new water <br />or sewer utilities are required. Conversly, the Project will support healthier air and soils through <br />local renewable energy generation and use of pollinator habitat in site stabilization. <br />The Project is expected to start construction and be completed in 2022. The Project will be <br />constructed in compliance with any applicable local, state, and federal regulatory standards, <br />including – but not limited to - the State of Minnesota’s Uniform Building Code and the National <br />Electric Code. A Site Plan is included as Appendix C and further details on the project and it’s <br />components are provided below. <br />