My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#15 - CEF Solar Farm CUP
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2023
>
04-04-23
>
#15 - CEF Solar Farm CUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 1:27:43 PM
Creation date
9/29/2025 1:26:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />10 <br /> <br />Once constructed, solar facilities operate passively and have no moving parts, besides the <br />tracking system. The only on-site activities that will occur during operations include periodic <br />vegetative maintenance and equipment maintenance and monitoring. <br />HOURS OF OPERATION <br />Construction activities will take place between 7am and 7pm. Following construction, the site <br />will be operational during daylight hours. <br />NUMBER OF EMPLOYEES <br />The project will employee approximately 10-15 people during peak construction for <br />approximately 4 to 6 months. After construction, there will be no on-site employees on a <br />regular basis. Maintenance technicians will visit the site 1-3 times per year for scheduled <br />maintenance, consisting of 2-4 employees. No one other than employees will access the site. <br />NUMBER OF TRIPS, VEHICLES AND TRAFFIC FLOW <br />Major material and equipment will be delivered by tractor-trailers and offloaded by construction <br />vehicles (lulls, tracked vehicles, and front-loading equipment). Equipment utilized during <br />construction of the Project may include dump trucks, trenching equipment, concrete trucks, front <br />loaders, backhoes, post installation equipment, and excavators. A staging area will be utilized <br />for unloading of equipment and materials. <br />During construction, traffic will consist of delivery trucks and personnel vehicles. It is expected <br />that no more than 4 delivery trucks will arrive on-site per day during construction. Following <br />construction, approximately one truck is expected to visit the site for maintenance work 1-3 <br />times per year. <br /> <br />PROJECT CONSULTATIONS <br />The Applicant has consultated a number of governmental agencies or affiliated third-parties to <br />complete due diligence of the site, determine how the proposed Project may impact the existing <br />conditions, and confirm the site design conforms with the Code. A summary of the results of <br />these consultations are below and consultation documentation is provided as Appendix E unless <br />otherwise stated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.