<br /> <br />11 <br /> <br />CITY PLANNING AND ZONING <br />The Applicant initially reached out to the City’s Planning and Zoning Deparment regarding the <br />proposed Project in February 2021 and then followed-up consistently through the application <br />submission to ensure the Project would comply with all code requirements for solar farms, and <br />to confirm the application process and submittal requirements. The Applicant’s primary contact <br />was the City Planner, Mr. Pen Prchal. At the time of this application, Mr. Prchal is no longer with <br />the City’s Planning and Zoning Deparment. As such, copies of emails exhanged between Mr. <br />Prchal and the Applicant are provided in Appendix E. The Applicant reached out to the City’s <br />consultants at Bolten & Menk in August 2021 and shared the Site Plan for review in advance of <br />application. <br />WETLANDS/VALLY BRANCH WATERSHED DISTRICT REVIEW <br />A Level 1 Wetland Delineation report was completed by Braun Intertec Corporation (Braun) in <br />December 2020 and submitted to the Valley Branch Watershed District (VBWD) in March 2021. <br />The VBWD requested completion of a field delineation following review of the proposed Project <br />and Level 1 report. Braun Intertec completed a field delineation (Level 2 Delineation) in April <br />2021, which identified two wetlands on-site. A Level 2 Wetland Delineation Report was submitted <br />to VBWD and US Army Corps of Engineers (USACE) in May 2021 via joint application for <br />wetland delineation concurrance. In June 2021, VBWD conducted an on-site review of the <br />completed wetland delineations with representatives from Braun and provided their concurance <br />of the delineations via a Minnesota Wetland Conservation Act Notice of Decision dated July 1, <br />2021. <br />Following wetland boundary confirmation, the Project was reconfigured to avoid wetland impacts <br />and a concept Site Plan was then emailed to VBWD with request for feedback. Mr. John Hanson, <br />the VBWD Engineer, provided comments by phone and email in July 2021 regarding the VBWD <br />Board’s past decisions to allow solar panels within wetland buffers, but not within delineated <br />wetlands. He also provided his expectations for how the VBWD Board would view the Project’s <br />anncillary equipment, such as fencing, access drives, and electrical equipment, located within <br />the wetlands buffers. Based on these conversations, the Project’s Site Plan was again revised <br />in conformance with VBWD’s preliminary guidance prior to this submittal.