ABSTRACT OF BIDS2023 STREET AND UTILITY IMPROVEMENTSCITY PROJECT NO. 2022.123CITY OF LAKE ELMO, MNBID DATE: APRIL 6, 2022 AT 10:00 AM123456NO.ITEMUNIT QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICEPART 1 - TANA RIDGE GENERAL1 MOBILIZATIONLS 1 $31,448.85 $31,448.85 $50,000.00 $50,000.00 $30,000.00 $30,000.00 $72,200.00 $72,200.00 $45,000.00 $45,000.00 $42,500.00 $42,500.002 TRAFFIC CONTROLLS 1 $2,231.29 $2,231.29 $4,000.00 $4,000.00 $21,000.00 $21,000.00 $2,780.00 $2,780.00 $10,000.00 $10,000.00 $5,000.00 $5,000.003 SILT FENCE, TYPE MACHINE SLICELF 780 $6.74 $5,257.20 $2.96 $2,308.80 $3.50 $2,730.00 $5.15 $4,017.00 $3.00 $2,340.00 $5.00 $3,900.004 CATCH BASIN INLET PROTECTIONEA 14 $121.70 $1,703.80 $149.91 $2,098.74 $125.00 $1,750.00 $190.00 $2,660.00 $460.00 $6,440.00 $175.00 $2,450.005 STREET SWEEPING (WITH PICKUP BROOM)HR 40 $142.61 $5,704.40 $160.45 $6,418.00 $150.00 $6,000.00 $167.00 $6,680.00 $185.00 $7,400.00 $225.00 $9,000.006 CLEARINGEA 6 $375.97 $2,255.82 $401.13 $2,406.78 $400.00 $2,400.00$594.00 $3,564.00 $355.00 $2,130.00 $600.00 $3,600.007 GRUBBINGEA 6 $250.29 $1,501.74 $188.53 $1,131.18 $200.00 $1,200.00$0.01 $0.06 $240.00 $1,440.00 $250.00 $1,500.008 SALVAGE AND REINSTALL MAILBOXEA 20 $127.81 $2,556.20 $135.38 $2,707.60 $225.00 $4,500.00 $136.00 $2,720.00 $125.00 $2,500.00 $175.00 $3,500.009 TEMPORARY MAILBOXEA 20 $14.91 $298.20 $75.21 $1,504.20 $50.00 $1,000.00 $75.80 $1,516.00 $15.00 $300.00 $65.00 $1,300.0010 SALVAGE AND REINSTALL SIGN WITH NEW POSTEA 4 $250.29 $1,001.16 $250.71 $1,002.84 $257.50 $1,030.00$253.00 $1,012.00 $240.00 $960.00 $250.00 $1,000.0011 SIGN PANELS TYPE CSF 20 $95.43 $1,932.46 $160.45 $3,249.11 $190.55 $3,858.64$187.00 $3,786.75 $90.00 $1,822.50 $90.00 $1,822.5012 TOPSOIL BORROW (LV)CY 640 $51.18 $32,755.20 $32.00 $20,480.00 $12.88 $8,243.20 $41.20 $26,368.00 $53.00 $33,920.00 $38.00 $24,320.0013 SEED MIXTURE 25-131 AND EROSION CONTROL BLANKETSY 2,300 $9.00 $20,700.00 $2.00 $4,600.00 $7.21 $16,583.00$7.20 $16,560.00 $2.40 $5,520.00 $10.00 $23,000.0014 SODSY 2,600 $13.31 $34,606.00 $12.00 $31,200.00 $10.82 $28,132.00 $10.80 $28,080.00 $20.00 $52,000.00 $16.00 $41,600.00TOTAL PART 1 - TANA RIDGE GENERAL$143,952.32 $133,107.25 $128,426.84 $171,943.81 $171,772.50 $164,492.50PART 2 - TANA RIDGE STREET AND STORM SEWER15 SALVAGE AND REINSTALL CATCH BASIN CASTING W/ NEW RINGS EA 7 $1,109.84 $7,768.88 $591.26 $4,138.82 $309.00 $2,163.00 $565.00 $3,955.00 $1,700.00 $11,900.00 $725.00 $5,075.0016 SALVAGE AND REINSTALL MANHOLE CASTING W/ NEW RINGS EA 11 $1,026.69 $11,293.59 $1,158.19 $12,740.09 $1,004.25 $11,046.75 $1,060.00 $11,660.00 $1,200.00 $13,200.00 $725.00 $7,975.0017 PATCH DOGHOUSE/INVERTEA 4 $419.14 $1,676.56 $457.69 $1,830.76 $231.75 $927.00 $269.00 $1,076.00 $301.00 $1,204.00 $725.00 $2,900.0018 REMOVE SEDIMENTEA 1 $1,631.47 $1,631.47 $358.52 $358.52 $515.00 $515.00 $1,170.00 $1,170.00 $3,450.00 $3,450.00 $1,200.00 $1,200.0019 ROTATE TOP SLAB OF EXISTING STORM STRUCTUREEA 1 $572.13 $572.13 $624.74 $624.74 $515.00 $515.00 $861.00 $861.00 $481.00 $481.00 $1,200.00 $1,200.0020 DITCH GRADINGLF 50 $32.66 $1,633.00 $22.63 $1,131.50 $36.05 $1,802.50 $19.40 $970.00 $95.00 $4,750.00 $40.00 $2,000.0021 6' CIPP - 15" RCPEA 1 $2,662.64 $2,662.64 $7,621.48 $7,621.48 $7,828.00 $7,828.00 $7,830.00 $7,830.00 $8,000.00 $8,000.00 $7,600.00$7,600.0022 2' X 3' CATCH BASIN PER DETAIL 404EA 1 $3,505.64 $3,505.64 $4,638.29 $4,638.29 $3,914.00 $3,914.00 $3,520.00 $3,520.00 $1,920.00 $1,920.00 $5,000.00$5,000.0023 4' DIA CBMH, 4' SUMP, WITH CASTING PER DETAIL 405EA 3 $5,315.06 $15,945.18 $6,614.10 $19,842.30 $5,974.00 $17,922.00 $6,500.00 $19,500.00 $4,690.00 $14,070.00 $8,200.00 $24,600.0024 15" RCP STORM SEWER, CLASS 5LF 46 $116.28 $5,348.88 $126.97 $5,840.62 $129.78 $5,969.88 $85.50 $3,933.00 $91.00 $4,186.00 $125.00 $5,750.0025 15" RC FLARED END SECTIONEA 3 $1,596.13 $4,788.39 $1,742.91 $5,228.73 $17.77 $53.31$1,470.00 $4,410.00 $2,610.00 $7,830.00 $2,300.00 $6,900.0026 RIPRAP W/ FABRIC, CLASS IIICY 15 $119.90 $1,798.50 $130.93 $1,963.95 $133.90 $2,008.50 $135.00 $2,025.00 $115.00 $1,725.00 $165.00 $2,475.0027 STORM SEWER TELEVISINGLF 46 $4.29 $197.34 $35.10 $1,614.60 $36.05 $1,658.30 $36.10 $1,660.60 $37.00 $1,702.00 $36.00 $1,656.0028 SAWCUT BITUMINOUS PAVEMENTLF 350 $2.50 $875.00 $2.67 $934.50 $2.06 $721.00 $3.05 $1,067.50 $2.00 $700.00 $5.00 $1,750.0029 SAWCUT CONCRETE PAVEMENTLF 350 $4.99 $1,746.50 $4.00 $1,400.00 $3.09 $1,081.50 $5.05 $1,767.50 $4.00 $1,400.00 $5.00 $1,750.00MILLER EXCAVATING, INC.OMG MIDWEST INC. DBA MINNESOTA PAVING & MATERIALST.A. SCHIFSKY & SONS, INC. PARK CONSTRUCTION COMPANYBITUMINOUS ROADWAYS INC. FOREST LAKE CONTRACTING, INC.
|