Laserfiche WebLink
ABSTRACT OF BIDS2023 STREET AND UTILITY IMPROVEMENTSCITY PROJECT NO. 2022.123CITY OF LAKE ELMO, MNBID DATE: APRIL 6, 2022 AT 10:00 AM123456NO.ITEMUNIT QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICEMILLER EXCAVATING, INC.OMG MIDWEST INC. DBA MINNESOTA PAVING & MATERIALST.A. SCHIFSKY & SONS, INC. PARK CONSTRUCTION COMPANYBITUMINOUS ROADWAYS INC. FOREST LAKE CONTRACTING, INC.30 REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT (DRIVEWAY) SY 220 $4.40 $968.00 $12.58 $2,767.60 $5.15 $1,133.00 $10.70 $2,354.00 $15.00 $3,300.00 $20.00 $4,400.0031 REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT (TRAIL)SY 130 $4.94 $642.20 $12.58 $1,635.40 $5.15 $669.50 $18.10 $2,353.00 $15.00 $1,950.00 $20.00 $2,600.0032 REMOVE AND DISPOSE OF CONCRETE PAVEMENT (SIDEWALK) SY 3 $16.56 $49.68 $18.03 $54.09 $20.60 $61.80 $16.70 $50.10 $48.00 $144.00 $200.00 $600.0033 REMOVE AND DISPOSE OF CONCRETE PAVEMENT (DRIVEWAY) SY 90 $5.51 $495.90 $18.03 $1,622.70 $6.18 $556.20 $13.20 $1,188.00 $29.00 $2,610.00 $30.00 $2,700.0034 REMOVE AND DISPOSE OF CONCRETE CURB AND GUTTERLF 70 $5.74 $401.80 $14.49 $1,014.30 $7.21 $504.70 $15.20 $1,064.00 $14.00 $980.00 $30.00 $2,100.0035 RECLAIM EXISTING BITUMINOUS AND BASE MATERIALSY 7,450 $1.03 $7,673.50 $3.00 $22,350.00 $4.84 $36,058.00$0.85 $6,332.50 $2.40 $17,880.00 $3.00 $22,350.0036 SALVAGE AND REINSTALL RECLAIM MATERIAL (CV)CY 70 $34.88 $2,441.60 $16.42 $1,149.40 $41.20 $2,884.00 $29.80 $2,086.00 $37.00 $2,590.00 $40.00 $2,800.0037 HAUL EXCESS RECLAIMED MATERIAL OFF SITE (LV)CY 150 $17.71 $2,656.50 $31.89 $4,783.50 $25.75 $3,862.50 $18.90 $2,835.00 $31.00 $4,650.00 $20.00 $3,000.0038 CORE DRILL 4" DRAIN TILE CONNECTION INTO CATCH BASIN EA 14 $1,375.66 $19,259.24 $1,502.15 $21,030.10 $875.50 $12,257.00 $765.00 $10,710.00 $212.00 $2,968.00 $1,200.00 $16,800.0039 4" PERFORATED PVC EDGE DRAIN W/ BACKFILL & WRAPLF 1,395 $24.99 $34,861.05 $27.29 $38,069.55 $27.81 $38,794.95 $27.30 $38,083.50 $25.00 $34,875.00 $28.00 $39,060.0040 DRAIN TILE CLEANOUTEA 14 $421.28 $5,897.92 $460.02 $6,440.28 $468.65 $6,561.10 $449.00 $6,286.00 $301.00 $4,214.00 $750.00 $10,500.0041 SUBGRADE CORRECTION (EV)CY 330 $24.63 $8,127.90 $30.00 $9,900.00 $30.90 $10,197.00$46.40 $15,312.00 $50.00 $16,500.00 $45.00 $14,850.0042 SUBGRADE PREPARATION OF RECLAIMED SURFACESY 9,870 $1.13 $11,153.10 $3.00 $29,610.00 $1.29 $12,732.30 $0.96 $9,475.20 $1.50 $14,805.00 $10.00 $98,700.0043 SALVAGE, STOCKPILE, AND RESPREAD RECLAIMED MATERIAL (UTILITY TRENCHES) LS 1 $1,844.69 $1,844.69 $1.00 $1.00 $2,060.00 $2,060.00 $3,090.00 $3,090.00 $6,000.00 $6,000.00 $20,000.00 $20,000.0044 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,C) [SPWEA230C] TN 750 $95.17 $71,377.50 $90.00 $67,500.00$88.25 $66,187.50 $97.80 $73,350.00 $108.00 $81,000.00 $85.00 $63,750.0045 TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,C) [SPNWB230C] TN 990 $89.53 $88,634.70 $87.00 $86,130.00 $82.95 $82,120.50 $86.70 $85,833.00 $98.00 $97,020.00 $85.00 $84,150.0046 BITUMINOUS MATERIAL FOR TACK COATGAL 580 $0.01 $5.80 $2.00 $1,160.00 $0.01 $5.80 $2.95 $1,711.00 $3.00 $1,740.00 $1.00 $580.0047 PATCH BITUMINOUS DRIVEWAYSY 250 $29.82 $7,455.00 $37.93 $9,482.50 $29.00 $7,250.00 $39.50 $9,875.00 $33.00 $8,250.00 $64.00 $16,000.0048 PATCH BITUMINOUS TRAILSY 90 $29.82 $2,683.80 $37.46 $3,371.40 $29.00 $2,610.00 $40.80 $3,672.00 $54.00 $4,860.00 $80.00 $7,200.0049 B418 CONCRETE CURB AND GUTTERLF 3,140 $17.50 $54,950.00 $21.00 $65,940.00 $17.36 $54,510.40 $18.40 $57,776.00 $16.00 $50,240.00 $18.00 $56,520.0050 SURMOUNTABLE CONCRETE CURB AND GUTTERLF 3,570 $17.69 $63,153.30 $19.00 $67,830.00 $17.36 $61,975.20 $17.90 $63,903.00 $16.00 $57,120.00 $18.00 $64,260.0051 CONCRETE MATURITY TESTINGLS 1 $566.24 $566.24 $10,000.00 $10,000.00 $463.50 $463.50$510.00 $510.00 $526.00 $526.00 $500.00 $500.0052 5" CONCRETE SIDEWALKSF 20 $13.02 $260.40 $7.62 $152.40 $11.59 $231.80 $12.50 $250.00 $12.00 $240.00 $21.00 $420.0053 6" CONCRETE DRIVEWAY PAVEMENTSY 100 $93.36 $9,336.00 $73.11 $7,311.00 $93.27 $9,327.00 $87.90 $8,790.00 $87.00 $8,700.00 $120.00 $12,000.0054 6" CONCRETE PEDESTRIAN RAMPSF 380 $15.06 $5,722.80 $13.45 $5,111.00 $17.05 $6,479.00 $14.00 $5,320.00 $14.00 $5,320.00 $18.00 $6,840.0055 TRUNCATED DOME PANELSSF 145 $56.62 $8,209.90 $60.92 $8,833.40 $52.53 $7,616.85 $51.00 $7,395.00 $53.00 $7,685.00 $50.00 $7,250.0056 ADJUST EXISTING VALVE BOXEA 10 $336.95 $3,369.50 $446.84 $4,468.40 $525.00 $5,250.00 $529.00 $5,290.00 $450.00 $4,500.00 $750.00 $7,500.00TOTAL PART 2 - TANA RIDGE STREET AND STORM SEWER$473,641.72 $547,626.92 $490,485.34 $490,299.90 $517,185.00 $645,261.00PART 3 - TANA RIDGE WATER57 REMOVE AND REPLACE HYDRANT FLAGEA 7 $200.22 $1,401.54 $109.43 $766.01 $154.50 $1,081.50 $208.00 $1,456.00 $434.00 $3,038.00 $125.00 $875.0058 REMOVE AND REPLACE HYDRANT NOZZLE WITH 5" STORZ NOZZLE EA 7 $1,857.47 $13,002.29 $2,028.28 $14,197.96 $1,905.50 $13,338.50 $1,580.00 $11,060.00 $1,565.00 $10,955.00 $1,400.00 $9,800.0059 CONCRETE HYDRANT SPLASH PADSF 70 $13.02 $911.40 $9.14 $639.80 $14.42 $1,009.40 $13.50 $945.00 $12.00 $840.00 $20.00 $1,400.00