My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-7-25 City Council Meeting Packet
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
10-7-25 City Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2025 12:23:03 PM
Creation date
10/20/2025 12:22:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The watermain will be installed using directional drilling to minimize roadway impacts and closures with <br />full excavations required at hydrants and tie-in locations (see anticipated excavation locations on the <br />attached location map). A 14-inch HDPE pipe will be installed (equivalent 12-inch watermain) to replace <br />the existing 6-inch watermain to complete a trunk network loop in support of the recent expansion of the <br />Old Village area. <br />A project schedule is attached and outlines the implementation timeframe to ready the improvements for <br />construction in 2026. The schedule proposes a February bid date to position the project for potentially <br />favorable pricing. To meet this early bid date, it will be important to complete the topographic survey along <br />the project corridor prior to winter snow cover. <br />FISCAL IMPACT: $77,600 to be paid from the Water Enterprise Fund for design phase services. A high <br />level preliminary cost estimate for the total project is roughly $850,000, based on a $330 per foot bid price <br />of directional drilling from the I-94 Forcemain bids. <br />RECOMMENDATION: Staff is recommending that the City Council authorize design phase services for <br />the CSAH 14 Watermain Improvements, from CSAH 17 (north leg) to Layton Avenue. The <br />recommended motion for this action is as follows: <br />“Move to authorize Bolton and Menk, Inc. to prepare plans and specifications in the amount of <br />$77,600 for the CSAH 14 Watermain Improvements, from CSAH 17 (north leg) to Layton <br />Avenue”. <br />ATTACHMENTS: <br />1.Project Location Map. <br />2.Project Schedule. <br />3.Engineer’s Fee Estimate.
The URL can be used to link to this page
Your browser does not support the video tag.