My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-05-2025 City Council Meeting Packet
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
11-05-2025 City Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2025 11:02:04 AM
Creation date
11/22/2025 11:00:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Description <br />The project scope includes the following improvements to County State Aid Highway (CSAH) 15 (Manning Avenue) from 30th <br />Street to CSAH 14 (Stillwater Boulevard/40th Street South): <br />1) highway expansion from a two-lane undivided highway to a four-lane divided highway <br />2) evaluation of trails on both the east and west sides of the highway <br />3) drainage improvements, including storm water treatment facilities <br />4) railroad crossing review <br /> <br />Preliminary design, along with public engagement, will determine the final project scope, right-of-way acquisition <br />requirements, and cost estimates. <br />Justification <br />CSAH 15 is the backbone of the county's transportation system; thus, it is an important north-south route connecting Interstate <br />94 to Lake Elmo, Stillwater, and beyond. A corridor study completed in 2014 identified these highway improvements, which are <br />necessary to ensure the ongoing safe and efficient operation of this highway segment. <br />RB-2801 <br />Type Account Name 2026 Budget 2027 Proposed 2028 Proposed 2029 Proposed 2030 Proposed Total <br />Funding <br />Local Contributions $0 $0 $0 $0 $100,000 $100,000 <br />State Aid $0 $0 $0 $0 $400,000 $400,000 <br />FUNDING TOTAL $0 $0 $0 $0 $500,000 $500,000 <br />Expenditures <br />Planning/Design $0 $0 $0 $0 $500,000 $500,000 <br />EXPENDITURES TOTAL $0 $0 $0 $0 $500,000 $500,000 <br />Budget Impact/Other <br />The project will increase operation and maintenance costs because of the added pavement widths and stormwater <br />infrastructure. <br />Capital Project Category: Road & Bridge <br />Location: Various/Other <br />District: District 3 <br /> <br />Total Estimated Project Cost: $500,000 <br />Prior Year(s) Total Cost: $0 <br />Project #: RB-2801 <br />Project Name: CSAH 15 - 30th Street to CSAH 14 <br />CIP 2026-2030 <br />122
The URL can be used to link to this page
Your browser does not support the video tag.