My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-20-26 City Council Meeting Packet
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2026
>
01-20-26 City Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2026 8:47:12 AM
Creation date
1/16/2026 8:38:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Improvements <br />Replace 1,700 feet of existing 6 -inch watermain with an equivalent 12 - <br />inch trunk watermain to complete a planned trunk watermain loop. <br />01 <br />New main to be installed underneath eastbound lane of Stillwater <br />Boule vard via dire c tional drilling at 8 .5 -feet of cover. <br />02 <br />Construction will require eastbound traffic on Stillwater Boulevard to <br />be detoured for the duration of the project. <br />04 <br />Services to existing residential and commercial businesses will be <br />replaced to the curb stop with the proposed construction efforts. <br />05 <br />The location and depth was strategically placed to potentially avoid <br />future conflicts with the reconstruction of Stillwater Boulevard. <br />03 <br />Service lines to the Lake Elmo Elementary School and Fury Motor <br />sites will be upsized to account for potential redevelopment needs. <br />06
The URL can be used to link to this page
Your browser does not support the video tag.