My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-20-26 City Council Meeting Packet
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2026
>
01-20-26 City Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2026 8:47:12 AM
Creation date
1/16/2026 8:38:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Costs <br />The CIP estimate was based on a high level, per linear foot basis.01 <br />A detailed estimate based off the design estimate the project will cost <br />more than originally antic ipate d. Se ve ral fac tors for this inc lude <br />maintenance of traffic along a busy county road, tight construction <br />limits, service replacement means and methods, and temporary water <br />s e rvic e c onfigurations . <br />02 <br />Capital Improvement Plan Estimate Final Design Engineer’s Estimate <br />$850,000 $940,000 <br />The estimate will be updated with actual construction costs when bids <br />are received. <br />03
The URL can be used to link to this page
Your browser does not support the video tag.