Laserfiche WebLink
ABSTRACT OF BIDS2026 STREET AND UTILITY IMPROVEMENTSCITY OF LAKE ELMO, MNCITY PROJECT NO. 139309BMI PROJECT NO. 25X.139309BID DATE: 2/5/2026TIME:10:00 AM 1 2 3 4ITEM APPROX.NO. ITEM QUANT. UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNTNorth Valley, Inc.Nowthen, MNPark Construction CompanyMinneapolis, MNMiller Excavating, Inc.Bayport, MNEngineer's EstimateMcNamara Contracting, Inc.Bolton & Menk, Inc.Rosemount, MN43 8" RECLAIM EXISTING BITUMINOUS AND BASE MATERIAL 29,710 SY $2.50 $74,275.00 $1.40 $41,594.00 $1.31 $38,920.10 $0.89 $26,441.90 $1.02 $30,304.2044 HAUL EXCESS RECLAIM MATERIAL OFF SITE (LV) 2,890 CY$20.00 $57,800.00 $27.00 $78,030.00 $15.21 $43,956.90 $21.61 $62,452.90 $19.57 $56,557.3045 SALVAGE, STOCKPILE, AND RESPREAD RECLAMED MATERIAL 1 LS $10,000.00 $10,000.00 $500.00 $500.00 $22,198.31 $22,198.31 $12,066.59 $12,066.59 $10,348.69 $10,348.6946 CONNECT TO EXISTING STORM SEWER STRUCTURE 2 EA $1,500.00 $3,000.00 $1,500.00 $3,000.00 $1,737.89 $3,475.78 $1,673.10 $3,346.20 $2,157.62 $4,315.2447 CONNECT TO EXISTING STORM SEWER PIPE 11 EA $1,500.00$16,500.00 $1,275.00 $14,025.00 $494.21 $5,436.31 $475.79 $5,233.69 $955.05 $10,505.5548 4" PERFORATED PVC EDGE DRAIN W/ BACKFILL & WRAP 2,047 LF $27.00 $55,269.00 $25.00 $51,175.00 $44.53 $91,152.91 $32.01 $65,524.47 $23.90 $48,923.3049 DRAIN TILE CLEANOUT 25 EA $500.00 $12,500.00 $295.00 $7,375.00 $706.02 $17,650.50 $249.19 $6,229.75 $459.64 $11,491.0050 SUBGRADE EXCAVATION (EV) 510 CY $35.00 $17,850.00 $32.00 $16,320.00 $30.15 $15,376.50 $47.80 $24,378.00 $18.22 $9,292.2051 COMMON EXCAVATION - STREET 280 CY $35.00 $9,800.00 $32.00 $8,960.00 $34.89 $9,769.20 $37.53 $10,508.40 $15.11 $4,230.8052 COMMON EXCAVATION - BOULEVARD 1,550 CY $20.00 $31,000.00 $32.00 $49,600.00 $42.38 $65,689.00 $0.01 $15.50 $19.88 $30,814.0053 SUBGRADE STABILIZING AGGREGATE (CV) 790 CY $20.00 $15,800.00 $19.00 $15,010.00 $23.52 $18,580.80 $18.42 $14,551.80 $42.62 $33,669.8054 SALVAGE AND REINSTALL RECLAM MATERIAL INNSDALE AVENUE (CV) 420 CY $40.00 $16,800.00 $5.00 $2,100.00 $56.79 $23,851.80 $0.01 $4.20 $14.46 $6,073.2055 SUBGRADE PREPARATION OF RECLAIMED SURFACE 30,950 SY$2.00 $61,900.00 $1.00 $30,950.00 $0.92 $28,474.00 $0.62 $19,189.00 $0.76 $23,522.0056 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,C) [SPWEA330C] 2,430 TN $90.00 $218,700.00 $81.00 $196,830.00 $82.83 $201,276.90 $81.84 $198,871.20 $87.04 $211,507.2057 TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,C) [SPNWB330C] 3,220 TN $85.00 $273,700.00 $81.00 $260,820.00 $76.13 $245,138.60 $76.43 $246,104.60 $80.61 $259,564.2058 BITUMINOUS MATERIAL FOR TACK COAT 2,050 GAL $2.00 $4,100.00 $2.00 $4,100.00 $4.18 $8,569.00 $3.75 $7,687.50 $4.43 $9,081.5059 PATCH BITUMINOUS DRIVEWAY 590 SY $45.00 $26,550.00 $42.00 $24,780.00 $33.66 $19,859.40 $48.28 $28,485.20 $33.45$19,735.5060 B418 CONCRETE CURB AND GUTTER 15,980 LF $17.00 $271,660.00 $16.00 $255,680.00 $17.32 $276,773.60 $17.01 $271,819.80 $17.89 $285,882.2061 6" CONCRETE DRIVEWAY PAVEMENT 190 SY $100.00 $19,000.00 $93.75 $17,812.50 $101.83 $19,347.70 $107.67 $20,457.30 $90.41 $17,177.9062 CONCRETE FLUME 188 SF $20.00 $3,760.00 $10.40 $1,955.20$11.30 $2,124.40 $11.95 $2,246.60 $15.56 $2,925.2863 SALVAGE AND REINSTALL PAVERS 40 SF $65.00 $2,600.00 $37.00 $1,480.00 $27.15 $1,086.00 $24.84 $993.60 $92.90 $3,716.0064 ADJUST EXISTING VALVE BOX 25 EA $400.00 $10,000.00 $850.00 $21,250.00 $309.56 $7,739.00 $671.93 $16,798.25 $597.41 $14,935.2565 CONCRETE HYDRANT SPLASH PAD 139 SF $15.00 $2,085.00 $12.00 $1,668.00 $13.03 $1,811.17 $13.61 $1,891.79 $15.75 $2,189.25TOTAL BASE BID $1,709,567.00 $1,570,583.60 $1,577,507.61 $1,599,270.03 $1,645,482.52