Laserfiche WebLink
ABSTRACT OF BIDS2026 STREET AND UTILITY IMPROVEMENTSCITY OF LAKE ELMO, MNCITY PROJECT NO. 139309BMI PROJECT NO. 25X.139309BID DATE: 2/5/2026TIME:10:00 AMITEM APPROX.NO. ITEM QUANT. UNIT UNIT PRICE AMOUNT1 MOBILIZATION 1 LS $80,000.00 $80,000.002 TRAFFIC CONTROL 1 LS $5,000.00 $5,000.003 SILT FENCE, TYPE MACHINE SLICE 80 LF $5.00 $400.004 SEDIMENT CONTROL LOG, TYPE WOOD FIBER 2,310 LF $3.00 $6,930.005 INLET PROTECTION 21 EA $200.00 $4,200.006 STREET SWEEPING (WITH PICKUP BROOM) 130 HR $170.00 $22,100.007 WATER FOR DUST CONTROL 90 MGAL $55.00 $4,950.008 CLEARING 7 EA $700.00 $4,900.009 GRUBBING 7 EA $500.00 $3,500.0010 SALVAGE AND REINSTALL MAILBOX 50 EA $150.00 $7,500.0011 TEMPORARY MAILBOX 50 EA $90.00 $4,500.0012 REMOVE SIGN AND POST 10 EA $100.00 $1,000.0013 SIGN PANELS TYPE C 64 SF $200.00 $12,800.0014 STREET NAME BLADE W/ POST 6 EA $350.00 $2,100.0015 TOPSOIL BORROW (LV) 1,550 CY $40.00 $62,000.0016 SODDING TYPE LAWN 9,270 SY $10.00 $92,700.0017 SEED RESTORATION AREA AND WOOD FIBER BLANKET 700 SY$7.00 $4,900.0018 SALVAGE AND REINSTALL MANHOLE CASTING W/ NEW RINGS 1 EA $900.00 $900.0019 SALVAGE AND REINSTALL CATCH BASIN CASTING W/ NEW RINGS 4 EA $550.00 $2,200.0020 REMOVE AND DISPOSE OF EXISTING STORM SEWER STRUCTURE 14 EA $600.00 $8,400.0021 REMOVE AND DISPOSE OF EXISTING STORM SEWER PIPE 274 LF $15.00 $4,110.0022 2' X 3' CATCH BASIN PER DETAIL 404 6 EA $3,500.00 $21,000.0023 4' DIA CBMH WITH CASTING PER DETAIL 406 7 EA $4,600.00 $32,200.0024 4' DIA CBMH WITH SUMP AND CASTING PER DETAIL 405 3EA $6,500.00 $19,500.0025 4' DIA MH WITH CASTING PER DETAIL 409 1 EA $5,500.00$5,500.0026 PATCH DOGHOUSE / INVERT 5 EA $550.00 $2,750.0027 12" RCP STORM SEWER, CLASS 5 56 LF $55.00 $3,080.0028 15" RCP STORM SEWER, CLASS 5 314 LF $60.00 $18,840.0029 18" RCP STORM SEWER, CLASS 5 137 LF $65.00 $8,905.0030 21" RCP STORM SEWER, CLASS 3 16 LF $200.00 $3,200.0031 24" RCP STORM SEWER, CLASS 3 16 LF $200.00 $3,200.0032 REMOVE AND REPLACE STEPS 2 EA $500.00 $1,000.0033 RIPRAP W/ FABRIC, CLASS III 17 CY $120.00 $2,040.0034 JET / CLEAN STORM SEWER PIPE 892 LF $15.00 $13,380.0035 TELEVISING STORM SEWER 1,431 LF $8.00 $11,448.0036 DITCH GRADING 20 LF $45.00 $900.0037 SAWCUT BITUMINOUS PAVEMENT 960 LF $3.00 $2,880.0038 SAWCUT CONCRETE PAVEMENT 230 LF $5.00 $1,150.0039 REMOVE AND DISPOSE OF BITUMINOUS PAVEMENT (DRIVEWAY) 530 SY $10.00 $5,300.0040 REMOVE AND DISPOSE OF CONCRETE PAVEMENT (DRIVEWAY) 130 SY $15.00 $1,950.0041 REMOVE CONCRETE FLUME 62 SF $20.00 $1,240.0042 REMOVE AND DISPOSE OF CONCRETE CURB AND GUTTER 73 LF $5.00 $365.00BASE BIDEngineer's EstimateBolton & Menk, Inc.5 6 7 8UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT$47,000.00 $47,000.00 $70,000.00 $70,000.00 $84,654.79 $84,654.79 $125,000.00 $125,000.00$12,000.00 $12,000.00 $4,232.00 $4,232.00 $10,550.00 $10,550.00 $6,500.00 $6,500.00$10.50 $840.00 $6.45 $516.00 $9.50 $760.00 $11.00 $880.00$3.00 $6,930.00 $3.75 $8,662.50 $4.50 $10,395.00 $3.00 $6,930.00$100.00 $2,100.00 $150.00 $3,150.00 $180.00 $3,780.00 $300.00 $6,300.00$100.00 $13,000.00 $196.00 $25,480.00 $170.00 $22,100.00$225.00 $29,250.00$100.00 $9,000.00 $100.00 $9,000.00 $45.00 $4,050.00 $60.00 $5,400.00$800.00 $5,600.00 $506.00 $3,542.00 $880.00 $6,160.00 $450.00 $3,150.00$800.00 $5,600.00 $178.00 $1,246.00 $350.00 $2,450.00 $155.00 $1,085.00$215.00 $10,750.00 $185.00 $9,250.00 $184.00 $9,200.00 $185.00 $9,250.00$88.00 $4,400.00 $79.35 $3,967.50 $82.00 $4,100.00 $80.00$4,000.00$37.00 $370.00 $37.05 $370.50 $40.00 $400.00 $40.00 $400.00$64.00 $4,096.00 $63.50 $4,064.00 $63.10 $4,038.40 $61.00$3,904.00$265.00 $1,590.00 $265.00 $1,590.00 $265.00 $1,590.00 $255.00 $1,530.00$10.00 $15,500.00 $47.25 $73,237.50 $52.00 $80,600.00 $71.00 $110,050.00$11.00 $101,970.00 $10.15 $94,090.50 $22.00 $203,940.00 $10.50 $97,335.00$5.50 $3,850.00 $5.35 $3,745.00 $6.50 $4,550.00 $5.00 $3,500.00$1,850.00 $1,850.00 $1,739.00 $1,739.00 $625.00 $625.00 $1,600.00 $1,600.00$1,850.00 $7,400.00 $846.00 $3,384.00 $760.00 $3,040.00 $1,200.00 $4,800.00$550.00 $7,700.00 $997.00 $13,958.00 $850.00 $11,900.00 $600.00 $8,400.00$27.00 $7,398.00 $8.75 $2,397.50 $22.00 $6,028.00 $25.00 $6,850.00$5,250.00 $31,500.00 $4,751.00 $28,506.00 $2,054.55 $12,327.30 $6,000.00 $36,000.00$6,000.00 $42,000.00 $5,845.00 $40,915.00 $4,436.72 $31,057.04 $6,400.00 $44,800.00$12,500.00 $37,500.00 $7,869.00 $23,607.00 $5,958.34 $17,875.02 $20,000.00 $60,000.00$5,700.00 $5,700.00 $5,271.00 $5,271.00 $4,684.16 $4,684.16 $8,250.00 $8,250.00$2,500.00 $12,500.00 $547.00 $2,735.00 $390.00 $1,950.00$1,000.00 $5,000.00$91.00 $5,096.00 $51.70 $2,895.20 $48.03 $2,689.68 $98.00$5,488.00$83.00 $26,062.00 $57.20 $17,960.80 $52.90 $16,610.60 $90.00 $28,260.00$93.00 $12,741.00 $61.25 $8,391.25 $60.42 $8,277.54 $105.00 $14,385.00$172.00 $2,752.00 $73.85 $1,181.60 $76.11 $1,217.76 $215.00 $3,440.00$178.00 $2,848.00 $79.30 $1,268.80 $91.50 $1,464.00 $220.00 $3,520.00$525.00 $1,050.00 $328.00 $656.00 $4,220.00 $8,440.00 $2,000.00 $4,000.00$200.00 $3,400.00 $164.00 $2,788.00 $218.00 $3,706.00 $195.00 $3,315.00$7.00 $6,244.00 $4.40 $3,924.80 $10.50 $9,366.00 $7.00 $6,244.00$5.00 $7,155.00 $3.85 $5,509.35 $3.00 $4,293.00 $5.00 $7,155.00$42.00 $840.00 $85.20 $1,704.00 $145.20 $2,904.00 $450.00$9,000.00$2.00 $1,920.00 $2.31 $2,217.60 $3.00 $2,880.00 $2.00 $1,920.00$5.75 $1,322.50 $6.40 $1,472.00 $5.00 $1,150.00 $6.00 $1,380.00$8.00 $4,240.00 $6.00 $3,180.00 $9.20 $4,876.00 $65.00 $34,450.00$12.00 $1,560.00 $13.85 $1,800.50 $14.10 $1,833.00 $135.00 $17,550.00$20.00 $1,240.00 $5.85 $362.70 $6.05 $375.10 $9.00 $558.00$25.00 $1,825.00 $34.95 $2,551.35 $28.00 $2,044.00 $40.00$2,920.00Bituminous Roadways, Inc.Mendota Heights, MNA-1 Excavating, LLCBloomer, WINorthwest Asphalt, Inc.Shakopee, MNGMH Asphalt CorporationChaska, MN