My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-17-26 City Council Meeting Packet
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2026
>
03-17-26 City Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2026 3:50:49 PM
Creation date
3/17/2026 3:39:48 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br />LA515\163\1077757.v2 <br />the inspection at each of the measurable points defined in the following paragraphs. <br />16. EROSION CONTROL. All construction regarding the Subdivision Improvements shall <br />be completed in a manner designed to control erosion and in compliance with the approved plans <br />and specifications for the construction, the City Code, the City’s Engineering Design and <br />Construction Standards Manual, all watershed district permits, the Minnesota Pollution Control <br />Agency’s best management practices, and other requirements including the City’s permit with the <br />Minnesota Pollution Control Agency for the municipal separate storm sewer system program. <br />Before initiating any work on the site, an erosion control plan must be implemented by the <br />Developer and inspected and approved by the City. Erosion and sediment control measures shall <br />be coordinated with the various stages of development. The City may impose additional erosion <br />control requirements at any stage in development as deemed necessary to maintain a compliant <br />site. All areas disturbed for site improvements must be reseeded by the Developer promptly after <br />the work in the area is complete unless construction of the next stage of the Subdivision <br />Improvements will begin in that area within seven (7) days. The parties recognize that time is of <br />the essence in controlling erosion. <br /> If the Developer does not comply with the erosion control plan and schedule or <br />supplementary instructions and warnings received from the City, the City may take such action <br />as it deems appropriate to control erosion. If the Developer does not reimburse the City for any <br />cost the City incurred for such work within 10 business days, the City may draw down the Security <br />to pay any costs. No development, utility or street construction will be allowed, and no building <br />permits will be issued by the City unless the Subdivision is in full compliance with the approved <br />erosion control plan. <br />If the City issues building permits before the acceptance of public Subdivision <br />Improvements, the Developer assumes all responsibility for erosion control compliance <br />throughout the Subdivision and the City may take such action as allowed by this Agreement <br />against the Developer for any noncompliant issue as stated above. Erosion control plans for
The URL can be used to link to this page
Your browser does not support the video tag.