Laserfiche WebLink
<br /> <br />TASK ORDER NO. 31 – 2027 STREET AND UTILITY IMPROVEMENTS Page 1 of 3 <br /> <br />TASK ORDER No. 31 <br />CITY OF LAKE ELMO, MINNESOTA – BOLTON AND MENK, INC. <br />PROFESSIONAL CONSULTING SERVICES AGREEMENT <br /> <br />In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and <br />Bolton and Menk, Inc. (“ENGINEER”), dated MARCH 20, 2013 (“AGREEMENT”), the ENGINEER agrees <br />to provide Professional Consulting Support Services as follows: <br /> <br /> <br />2027 STREET AND UTILITY IMPROVEMENTS <br /> <br />PROJECT OVERVIEW: This Project includes Professional Engineering Services for the 2027 Street and <br />Utility Improvements, to be authorized in phases and beginning with preliminary design and <br />feasibility report support services. Upon completion of the preliminary design and feasibility report <br />support services, this Task Order may be later amended to authorize the preparation of plans and <br />specifications and/or construction phase support services as may be applicable. <br /> <br />The improvements include the rehabilitation of the public streets, consisting of approximately 10,200 <br />feet (1.9 miles) of local streets located in the OACE Acres neighborhood as follows: <br /> <br />· Hidden Bay Trail North, CSAH 13 (Olson Lake Trail) to Birchbark Trail North including a spur <br />street <br />· Hidden Bay Court North, Hidden Bay Trail North to CDS <br />· Birchbark Trail North, Hidden Bay Trail North to CDS <br />· Cherrywood Trail North, Birchbark Trail North to Hidden Bay Trail North <br />· Deer Pond Trail North, Windbreak Trail North to Jack Pine Trail North <br />· Jack Pine Trail North, Windbreak Trail North to Deer Pond Trail North <br />· Windbreak Trail North, Deer Pond Trail North to Hidden Bay Trail North <br /> <br />The improvements will consist of either a full street reconstruction or full-depth pavement <br />reclamation, to be determined through a detailed geotechnical investigation. New concrete curb and <br />gutter will be installed to replace the existing bituminous curb or ribbon curb will be utilized in rural <br />section road areas. In addition to the street improvements, the storm sewer or drainage along each <br />street will be reviewed and upgraded as necessary to prevent water from standing on or along the <br />street, and to repair or replace existing storm sewer infrastructure as recommended through the <br />preliminary design site investigations. <br /> <br />All project streets are outside of the City’s MUSA boundary and therefore, no sanitary sewer <br />extension will be considered at this time. City water is not available to the area and analysis of a <br />possible extension is not included in this scope of services. <br /> <br />SERVICES TO BE PROVIDED BY ENGINEER: Bolton and Menk, Inc., Inc. shall provide the following <br />Professional Engineering Services: <br />