My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
December 19, 2006 CCP
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2000's
>
2006
>
December 19, 2006 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 11:54:40 AM
Creation date
10/1/2019 3:19:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPROVED: 12/11/06 <br />Commission Roth said he has difficulty with the existing lot size. <br />Commissioner Armstrong said the city should not be creating new lots with easements for <br />access. He said there are serious environmental concerns for the septic system on this parcel in a <br />neighborhood with a history of bad soils and failing septic systems. There are 201 systems in <br />this area. <br />M/S/P, Roth/Deziel to table the Miller application for variances until the December 11, 2006 <br />Meeting where the requested information will be provided by the applicants. Vote: 9:0, <br />Public Hearing: <br />Preliminary Plat of EAGLE POINT BUSINESS PARK 7TH ADDITION <br />and also Section 520 Site Plan Review for Phase 3 Office Center <br />The Assistant Planner said the pro <br />within Eagle Point Business Park <br />also been provided for a 2-story, 4 <br />applicants do not have a tenant foi <br />the two newly platted lots from Hi <br />and water will be available to this <br />maintain the pond so no easement <br />yet. The Landscape Plan was revi <br />Dale Glowa, United Land, LLC <br />Mr. Glowa said this site plan is a <br />and it will be constructed of the si <br />another phase in the future. The I <br />property owners. It is like a shop, <br />maintained by the owners. <br />THE CHAIRMAN OPENED THE <br />Nobody came forward to speak. <br />THE CHAIRMAN CLOSED THE <br />rosal before the Planning Commission is a replat of one outlot <br />;"' Addition into two parcels and one outlot. A site plan has <br />),000 square feet office building on one of the lots. The <br />the building at this time. The street will be located between <br />dson Boulevard northerly to Eagle Point Boulevard. Sewer <br />tte. She said that the City Engineer said the city does not <br />suggested for it. No exterior lighting plan was submitted <br />ed by the City Forester and it meets minimum requirements. <br />M/S/P, Ptacek/Roth to recommend <br />plan of EAGLE POINT BUSINESS <br />Section 520 Site Plan for the 40,000 <br />Office Center Phase III on Lot 2, BI <br />on plans within the planning packet <br />following conditions: <br />1. Compliance with the <br />2, Compliance with the <br />ication of the phase II building which is now 80% leased, <br />material but this will be a two-story version. There will be <br />to drive is created by an access agreement among all the <br />center with drive aisles but built to city specifications but <br />HEARING AT 8:05 P.M. <br />HEARING AT 8:06 P.M. <br />oval of the preliminary plat and PUD development stage <br />RK 7TH ADDITION, and to recommend approval of the <br />are feet, two-story office building known as Eagle Point <br />i of Eagle Point Business Park 7 h Addition as depicted <br />as recommended by the Assistant City Planner with the <br />3. Only parking depicted by the SitA Plan <br />Point Business Park 7`' Addition slier <br />4. Submission of a complete exterio gh <br />of the City Engineer, <br />of the Watershed District, as found to be <br />on Lot 2, Block 1, Eagle <br />photometric plan demonstrating compliance <br />Lake Elmo Planning Commission Meeting Minutes from November 27, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.