My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
December 5, 2006 CCP
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2000's
>
2006
>
December 5, 2006 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 11:54:41 AM
Creation date
10/1/2019 3:19:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
enough rooting space in a median to accommodate a tree with such a large mature size. Japanese <br />tree lilac would be a better choice for parking lot medians, since it is a small statured tree with <br />good tolerance to de-icing salts. The following language should be added to the "planing detail" <br />for trees: 'Twine should be removed from the base of the trunk and the top of the burlap should be <br />removed or folded back into the planting hole before the root ball is covered with soil. Also, the <br />top rungs of any wire basket enclosing the root ball s hould be removed before back -filling". <br />There are a total of 88 trees (73 of them deciduous, overstory trees) specified to be planted in the <br />landscape plan...." <br />Findings and Recommendations: <br />Based on the foregoing, staff suggests the Commission find the proposed Site Plan and Preliminary Plat <br />complies with the standards and requirements of the City Code and the approved Eagle Point Business Park <br />PUD Plan; and, that the proposed Final Plat of Eagle Point: Business Park 7°i Addition complies with City <br />Code platting requirements and the approved Preliminary Plat of the Eagle Point Business Park. <br />Planning Commission Actions Requested: <br />Motion to recommend to the City Council that the Preliminary Plat of Eagle Point Business Park 7"' <br />Addition and Section 520 Site Plan for a 40,000 square foot office building on Lot 2, Block 1 of Eagle <br />Point Business Park 76i Addition be approved subject to the following: <br />1. Compliance with the recommendations of the City. Engineer. <br />2. Compliance with the recommendations of the Watershed District, as found to be reasonable and <br />practical by the City Engineer. <br />3. Only parking depicted by the Site Plan located specifically on Lot 2, Block 1 Eagle Point Business <br />Park 7"' Addition is hereby approved. <br />4. Submission of a complete exterior lighting photometric plan demonstrating compliance with the <br />City exterior lighting standards prior to issuance of a building permit. <br />S. Submission of a Letter of Credit equal to 100% of the site landscape improvements guaranteeing <br />survival of those improvements for 2 growing seasons, as prescribed by Section 520 of the City <br />Code. <br />6. Payment of Park Dedication Fees -in -Lieu $12,133.61 (5.062X$2,397) prior to City release of the <br />Final Plat for recording. The Development Agreement is now structured to collect a pro rate <br />portion of those fees with each building permit issued within the business park. <br />Kelli Matzek, Assistant Plarmer <br />Attachments: <br />1. Location Map <br />2. City Engineer's Memo (If Available) <br />3. Applicant's Documentation <br />
The URL can be used to link to this page
Your browser does not support the video tag.