My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
February 21, 2006 CCP
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
2000's
>
2006
>
February 21, 2006 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 11:54:41 AM
Creation date
10/1/2019 3:19:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
inspection and reinforcement of the existing stone base and <br />footings; the addition to one copula; the addition of weather <br />vanes/lightening rods; and other architectural details as <br />illustrated on the Architectural Plans/Drawings; dated the 14t" <br />day of September, 2005 and approved by the City Engineer so as <br />to reflect the architectural heritage of the area and to enhance <br />the historic appearance of the barn structure. Said restoration <br />and improvements shall be in an amount of not less than <br />$25,000.00 as determined by the City building official. <br />The Developer shall convey Outlot A, Sanctuary of Lake Elmo and <br />the improved historic barn structure to the Sanctuary of Lake <br />Elmo Homeowners Association or to the owner of Lot 1, Block 1, <br />Sanctuary of Lake Elmo, subject to the following restrictions, <br />which shall be recorded as a declaration of covenants and the <br />restrictions: <br />The grantee shall be responsible for the maintenance of <br />the historic barn structure. <br />The grantee may not convert the historic barn structure for <br />use as a residential dwelling and shall not use the historic <br />barn structure for a commercial use. <br />3. If Outlot A is conveyed to the owner of Lot 1, Block 1, <br />Sanctuary of Lake Elmo, shalt thereafter only be conveyed <br />as part of a conveyance involving the sale of Lot 1, Block 1, <br />Sanctuary of Lake Elmo and both parcels shalt be combined <br />for tax purposes. <br />4. Historic barn improvements shall be completed on or <br />before the 315t day of October, 2006. <br />4.02 Estimated Cost of Developer Secured Improvements. The estimated <br />costs of Developer constructed improvements are as follows: <br />Improvement <br />Estimated Cost <br />Site Grading/Turf Restoration <br />Browns Creek Watershed <br />Historic Barn Structure <br />$ <br />25,000 <br />Landscaping <br />$ <br />110,000 <br />Storm Sewer <br />$ <br />285,209 <br />Street Improvements <br />$ <br />488,950 <br />Waste Water Treatment System/Drain Fields <br />$ <br />775,000 <br />Sanitary Sewer Laterals <br />$ <br />132,468 <br />Street Signs <br />$ <br />1,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.