Laserfiche WebLink
Lake Elmo City Council Meeting 11-15-83 Page 5 <br />7. Engineer's Report: <br />a. Castle Design - Drainage problem on the parcel of land <br />owned by Castle Design. <br />Discussion of the City storm sewer that discharges about the <br />middle of this parcel (Lots 228 thru 232 in Lanes Demontreville). <br />Bohrer analyzed the corrective actions that could be taken as <br />outlined in his letter of 11/4/83 and stated further that <br />regardless of which of his suggestions were chosen, the work <br />could not be done until the spring of 1984. <br />Gervais asked Bohrer if the $1,000 proposal included removing the <br />the gravel and restoring his property. <br />Bohrer stated that he had walked over the property, and did not <br />see a gully, but in answer to the question, there was no <br />allowance included in the $1,000 figure for restoration other <br />than restoration for the pipe installation. <br />M/S/P Mazzara/Fraser - to adopt City Engineer's recommendation, <br />ie: to extend the storm sewer south along the edge of Hill Trail <br />approximately 132 feet to the south line of the Castle Design <br />property and there discharge to Lake Demontreville. This would <br />also require obtaining a drainage easement along the old vacated <br />Shore Drive, unless an easement was retained when vacated. This <br />proposal requires about $1,000 for pipe material costs and about <br />4-5 days crew and equipment time. (4 ayes) <br />t Discussion as to when the work would be done. Bohrer stated that <br />his reason for waiting until spring was the availability of <br />blacktop. Consensus of the City Council was to address the matter <br />as something that should be done as soon as feasible this next <br />spring. <br />b. Final acceptance and final payment for Jamaca Court <br />(Aschbach Construction). <br />Bohrer stated that the Jamaca Court Improvements were complete <br />and recommended the project be accepted and final payment <br />authorized to Ashbach Construction in the amount of $14,385.67. <br />M/S/P Dunn/Mazzara - To accept the Engineer's Report and <br />authorize payment to Ashbach Construction in the amount of <br />$14,385.67. (4 ayes) <br />Bohrer pointed out that there was a "soft spot" in the road, <br />which was not the fault of the contractor, and feels it should be <br />fixed in the spring. Bohrer has given an estimate of $150.00 for <br />this repair, which should be included in the total cost of the <br />improvements. <br />C. Final acceptance and final payment for Reid Park <br />r Improvements (Mogren Brothers). <br />1 <br />