My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-21-88 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1980's
>
1988
>
06-21-88 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 7:32:15 PM
Creation date
10/2/2019 8:11:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c •� <br />No dedicated right-of-way exists for these streets. By virtue of <br />maintained use, the City is entitled only to the roadway and possibly the <br />ditches. The intent of this project is to obtain a minimum of 66 feet by <br />permanent easement. <br />The proposed improvements have been studied and determined to be feasible <br />and should best be made as proposed. <br />u <br />Some additional slope easements and temporary construction easements will <br />be required from various property owners to properly match existing <br />driveways and property. <br />.mpletion <br />There is a chance that the grading and gravel base portion of the work <br />could be completed during the 1988 construction season, if necessary right- <br />of-way can be obtained and the plans approved by MnDOT. The paving will be <br />completed in the 1989 construction season. If the right-of-way must be, <br />obtained by condemnation, the entire project would be constructed in 1989. <br />Estimated Project Cost <br />Attached to this report is a detailed estimate of construction costs for <br />the'road improvements. The total estimated project cost includes 10 <br />percent for contingencies and 20 percent for engineering costs. Estimates <br />and contracts are prepared on a unit price basis. The contractor will be <br />paid only for the work completed. The estimated cost of the improvements <br />is itemized as fol lows: <br />Construction <br />$191,234 <br />Contingencies <br />$ 19,123 <br />Engineering <br />$ 42,071 <br />Land <br />$ 90,000 <br />Relocation <br />$ 10,000 <br />Easements <br />$ 20,000 <br />Appraisals <br />$ 3,000 <br />Soil Borings <br />$ 2,000 <br />Legal <br />$ 3,000 <br />Administrative <br />$-2J QQ <br />Total Estimated Project Cost <br />$382,428 <br />_4_ 9150-008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.