Laserfiche WebLink
TABLE 1 <br />COST ESTIMATE FOR EXCAVATION/DISPOSAL OF WASTE <br />FROM WASHINGTON COUNTY SANITARY LANDFILL NO. 1 <br />Item <br />No. Cost Item <br />1 WASTE MONITORING <br />35 Borings in Refuse <br />Sample Analysis <br />Verification Sampling <br />at Disposal Facility <br />2 WASTE EXCAVATION <br />Site Preparation <br />(10) Dozer & Crew <br />(650 cy/day) <br />(10) Front End Loader <br />+ Crew (650 cy/day) <br />(1) Surveying Crew <br />Unit <br />Quantity Unit Price <br />1,000 VF $ 35 <br />1,250 Samp. 700 <br />12,500 Samp. 200 <br />SUB TOTAL <br />35 Ac 2025 <br />390 Day <br />1220 <br />390 Day <br />1270 <br />390 Day <br />850 <br />SUB <br />TOTAL <br />3 WASTE TRANSPORTATION <br />(via truck) <br />To Solid Waste LF 100,000 <br />To RCRA Landfill* 25,000 <br />4 WASTE DISPOSAL (includ- <br />ing Disposal Tax) <br />80% at Solid Waste LF 800,000 <br />20% at RCRA Landfill 200,000 <br />5 BACKFILL/SITE RESTOR. <br />Common Borrow 130,000 <br />Backfilling 130,000 <br />Compaction 130,000 <br />Grading/Seeding 35 <br />6 SITE SAFETY <br />(3) Site Safety Pers. 3,120 <br />Monitoring Equip. 390 <br />Sample Analysis 1,700 <br />Equip./Pers. Decontam. <br />Facilities/Operation 1 <br />Safety Equipment 10,000 <br />Loads 105 <br />Loads 2450 <br />SUB TOTAL <br />Ton 65 <br />Ton 125 <br />SUB TOTAL <br />CY <br />7 <br />CY <br />.93 <br />CY <br />1.71 <br />Ac <br />8000 <br />SUB <br />TOTAL <br />Hrs 50 <br />Days 300 <br />Samp. 500 <br />L.S. <br />M-Day 50 <br />SUB TOTAL <br />Total <br />$ 36,750 <br />875,000 <br />2,500,000 <br />$ 3,400,000 <br />$ 71,000 <br />4,758,000 <br />4,953,000 <br />331.500 <br />$ 10,000,000 <br />$ 10,500,000 <br />61,250,000 <br />$ 72,000,000 <br />$ 52,000,000 <br />25,000,000 <br />$ 77,000,000 <br />$ 910,000 <br />120,900 <br />222,300 <br />280,000 <br />$ 1,500,000 <br />$ 468,000 <br />117,000 <br />850,000 <br />250,000 <br />500.000 <br />$ 2,200,000 <br />