Laserfiche WebLink
TABLE 1 (continued) <br />TOTAL CONTRACTOR COST $166,000,000 <br />ENGINEERING, DESIGN, ADMIN. & SOPERVISON (10%) $ 16,600,000 <br />CONTINGENCIES (10%) ,$ 16,600,000 <br />TOTAL COST ESTIMATE = $200,000,000 <br />For Truck Trans. <br />$160,000,000 <br />For Rail Transport <br />*If via rail, estimate at $100/ton or about $20,000,000 for a <br />cost -savings of about $40,000,000 if rail access to landfill <br />were available. <br />