My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-16-88 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1980's
>
1988
>
08-16-88 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 7:32:15 PM
Creation date
10/2/2019 8:11:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 5, 19£ <br /><Name> <br /><Address> <br /><City> <br />Dear <Last>: <br />Project 1007 was designed and built to control flooding in the Valley <br />Branch Watershed District. Certain properties,because of their elevation, <br />could not be totally protected from flood waters in the case of the <br />100-year precipitation event. <br />Costs of floodproofing certain homes were included in the total cost of <br />the Project 1007. Your property was identified as one of those which might <br />suffer damage in the 100-year event. You may or may not want to floodproof <br />your home. If you desire to floodproof your home, you may choose to <br />construct an earthen berm between your house and the body of water or <br />stream and install drain tile and a high -capacity pump or you may want to <br />raise your home above the 100-year flood elevation. <br />The Managers have determined the maximum amount of money that will be <br />expended by the District on each parcel, based on analysis of the specific <br />parcel by Barr Engineering Co. The maximum amount was determined to be <br />realistic based on quotes which have been obtained from two contractors, <br />namely, Croixland Excavating and Triple A Pollution Control. The ,Valley <br />Branch Watershed District will not be doing the work. Each property owner <br />will hire his or her own contractor to do the work. You will be reimbursed <br />up to the maximum amount determined for your parcel. See the attached <br />sheet for conditions. If you plan to take advantage of this offer, please <br />notify the Board of Managers by September 15, 1988. The Board is proposing <br />that all floodproofing be completed by August 1, 1989. <br />The contact person regarding floodproofing is either Allen Dornfeld <br />at 777-5590 or Nels Nelson at 830-0542. <br />Sincerely, <br />Allen Dornfeld <br />AD/mmm <br />Enclosure <br />VBL/315,0 <br />ALLEN DORNFELD RUSSELL KIRBY GORDON C. MOOSBRUGGER RAY BRENNER WILLIAM ROHRER <br />VALLEY BRANCH WATERSHED DISTRICT <br />P.O. BOX 838 LAKE ELMO, MINNESOTA 55042-0538 <br />
The URL can be used to link to this page
Your browser does not support the video tag.