Laserfiche WebLink
CALCULATION OF ASSESSABLE COSTS <br />1988 BITUMINOUS OVERLAY PROJECT <br />LAKE ELIO, MINNESOTA <br />COMMISSION NO. 9150-008 <br />BITUMINOUS MIXTURE <br />BITUMINOUS MATERIAL <br />TACK COAT <br />CRUSHED L I MESTONE <br />873 <br />TN <br />$ 12.45 <br />$10,868.85 <br />49.8 <br />TN <br />$133.00 <br />$ 6,623.40 <br />735 <br />GA <br />$ 1.00 <br />$ 735.00 <br />2 <br />TN <br />$ 8.90 <br />$ 17.80 <br />CONSTRUCTION COST <br />ENGINEERING AND ADMINISTRATION <br />TOTAL COST <br />ASSESSMENT RATE _ $19,839.12 = <br />41 LOTS <br />$483.88/LOT <br />$18,245.05 <br />$ 1,594.07 <br />$19,839.1 2 <br />