Laserfiche WebLink
CALCULATION OF ASSESSABLE COSTS <br />1988 BITUMINOUS OVERLAY PROJECT <br />LAKE ELMO, MINNESOTA <br />COMMISSION NO. 9150-008 <br />Epipil <br />BITUMINOUS MIXTURE <br />BITUMINOUS MATERIAL <br />TACK COAT <br />ADJUST MANHOLE CASTINGS <br />590.1 <br />TN <br />$ 12.45 <br />$ 7,346.75 <br />33.6 <br />TN <br />$133.00 <br />$ 4,468.80 <br />498 <br />GA <br />$ 1.00 <br />$ 498.00 <br />3 <br />EA <br />$130.00 <br />$ 390.00 <br />CONSTRUCTION COST <br />ENGINEERING AND ADMINISTRATION <br />TOTAL COST <br />ASSESSMENT RATE _ $13,813.46 = <br />20 LOTS <br />$690.67/LOT <br />$12..703.55 <br />$ 1;1 09.91 <br />$13,813.46 <br />