Laserfiche WebLink
1988 BITUMINOUS OVERLAY PROJECT <br />LAKE EL M0, M I N NESOTA <br />COMMISSION NO. 91 50-008 <br />COST SUMMARY <br />CONSTRUCT ION <br />ENGINEERING <br />ADMINISTRATION <br />TOTAL PROJECT COST <br />i <br />$ 64,961.45 <br />$ 5,025.50 <br />$ 650.00 <br />$ 70,636.95 <br />