My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-88 Special CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1980's
>
1988
>
09-08-88 Special CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 7:32:15 PM
Creation date
10/2/2019 8:12:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CALCULATION OF ASSESSABLE COSTS <br />1988 BITUMINOUS OVERLAY PROJECT <br />LAKE ELMO, MINNESOTA <br />'COMMISSION NO. 9150-008 <br />A. H I L LTOP AV ENUE <br />BITUMINOUS MIXTURE <br />825 <br />TN <br />$ 12.45 <br />$10,271.25 <br />BITUMINOUS MATERIAL <br />47 <br />TN <br />$133.00 <br />$ 6,251.00 <br />BITUMINOUS CURB REPAIR <br />37 <br />LF <br />$ 2.00 <br />$ 74.00 <br />TACK COAT <br />696 <br />GA <br />$ 1.00 <br />$ 696.00 <br />CONSTRUCTION COST $17,292.25 <br />ENGINEERING AND ADMINISTRATION $ 1 ,51 0.78 <br />TOTAL COST $18,803.03 <br />ASSESSMENT RATE = $18,80 .03 = $553.03/LOT <br />34 LOTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.