Laserfiche WebLink
CALCULATION OF ASSESSABLE COSTS <br />1988 BITUMINOUS OVERLAY PROJECT <br />LAKE ELMO, MINNESOTA <br />'COMMISSION NO. 9150-008 <br />A. H I L LTOP AV ENUE <br />BITUMINOUS MIXTURE <br />825 <br />TN <br />$ 12.45 <br />$10,271.25 <br />BITUMINOUS MATERIAL <br />47 <br />TN <br />$133.00 <br />$ 6,251.00 <br />BITUMINOUS CURB REPAIR <br />37 <br />LF <br />$ 2.00 <br />$ 74.00 <br />TACK COAT <br />696 <br />GA <br />$ 1.00 <br />$ 696.00 <br />CONSTRUCTION COST $17,292.25 <br />ENGINEERING AND ADMINISTRATION $ 1 ,51 0.78 <br />TOTAL COST $18,803.03 <br />ASSESSMENT RATE = $18,80 .03 = $553.03/LOT <br />34 LOTS <br />