Laserfiche WebLink
X <br />Honorable Mayor and City Council <br />Lake Elmo, Minnesota <br />December 2, 1988 <br />Page Two <br />B. 25% of individual on -site systems and all individual off -site, or <br />clustered, systems w it I be inspected In the f iel d. At that time, <br />all inspection and access covers will be removed and the system <br />checked for uneven distribution of effluent, differential <br />settlement, or other evidence of poor performance. Observation of <br />ground surface wil I be made to determine if excessive surface <br />wetness or breakout has occurred. <br />C. Oakland School system and Old Village Remote D are fitted with <br />groundwater monitoring wells. Groundwater will be sampled and <br />analyzed in accordance with the Groundwater Monitoring Plan. <br />We will be presenting the report at the Council meeting. Because the <br />Council does not plan to meet again in December and since we must certify <br />the project on December 31, 1988, we will ask the Council to approve the <br />Evaluation Report. <br />rzaammice - oe <br />The City Council should approve the One Year Project Evaluation Report and <br />direct the City Engineer to submit the report by December 31, 1988. <br />Sincerely yours, <br />Larry 0. Boh rer, P.E. <br />LOB:j <br />