My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-16-89 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1980's
>
1989
>
05-16-89 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 7:22:30 PM
Creation date
10/2/2019 8:14:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r" <br />Introduction <br />38th and 39th Streets North in Bordner's Gardner Farmettes was studied in 1983 <br />for a patch and overlay project. At that time the streets were crack Ing, but <br />the pavement had not yet broken loose. Today the streets are In worse <br />condition; the pavement has broken loose in many areas, and there is <br />additional cracking. <br />Improvement <br />It is proposed to cut out the broken up areas and patch those spots with <br />bituminous. A 211 thick overlay will then be placed over the entire street to <br />strengthen the road and to seal off the cracks. Two culverts would be <br />installed to improve drainage. Crushed rock would be added along the <br />shoulders and at driveways as needed. <br />Feast hiII±y <br />( The project Is feasible. <br />initiation <br />This project was initiated by the City Council. Ordering the project will <br />require a four -fifth majority of the Council. <br />-2- 9150-009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.