Laserfiche WebLink
r <br />Item Unit <br />1. <br />4" Full Depth Patch <br />1,900 <br />Sy <br />$ <br />10.00 <br />$19000 <br />2. <br />Tack Coat <br />600 <br />GAL <br />$ <br />1.25 <br />$ 750 <br />3. <br />2" Overlay (2341) <br />1,400 <br />TN <br />$ <br />14.00 <br />$19,600 <br />4. <br />Bituminous Material for Mix <br />85 <br />TN <br />$ <br />140.00 <br />$11,900 <br />5. <br />Crushed Rock Shouldering <br />100 <br />TN <br />$ <br />10.00 <br />$ 1,000 <br />6. <br />15" CMP Culverts <br />85 <br />FT <br />$ <br />16.00 <br />$ 1,360 <br />7. <br />8. <br />15" Aprons <br />Catch Best <br />4 <br />1 <br />EA <br />A <br />$ <br />$1,000,00 <br />100.00 <br />$ 400 <br />$ 1,000 <br />$55,010 <br />+ 10% Contingency 5,490 <br />Estimated Construction Cost $60,500 <br />+ Engineering and Administration $ 6,050 <br />Total Estimated Project Cost $66,550 <br />It is proposed that the entire cost of the project be assessed to abutting <br />property. Listed below are the assessment alternatfves for the Council's <br />consi derati on. <br />The Unit Method gives a per lot rate of $1,386.46 <br />The Frontage.Method gives a rate of <br />$6.665/FF for a range of assessments from $ 833,.00 to $3,006.00 <br />The Conbination Method gives a <br />range of assessments from <br />$1,110.00 to $2,196.00 <br />-3- 9150-009 <br />