My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-16-89 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1980's
>
1989
>
05-16-89 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 7:22:30 PM
Creation date
10/2/2019 8:14:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20th Street North from CSAH 17 to Manning Trail is being considered in this <br />report for an overlay. 20th Street North is an MSA route and is eligible for <br />maintenance funds to offset the total cost of the project. <br />20th Street has been patched and had spot overlays done over the past few <br />years; however, the road surface continues to breakup due to Inadequate <br />subgrade strength. It Is recommended that a 20 overlay be placed over the <br />street to increase the strength of the road and to seal off the cracks. <br />Gravel would be added to the shoulders to bring than up to finished grade. <br />Existing driveways will not be altered. <br />each entrance. <br />A tapered edge will be raked out at <br />The project Is feasible and should best be made as proposed. <br />u. ZT81111MO _ <br />Included is a detailed cost estimate. Estimates and contracts are prepared on <br />a unit price basis. The contractor will only be paid for work completed. For <br />estimating purposes, 10% contingencies and 20% for engineering, legal and <br />administration are Included. <br />Item Unit <br />No. De5crjption Quantity Price Amount _ <br />1 Bituminous Mixture (2341) 1,460 TN $ 14.00 $20,440.00 <br />2 Bituminous Material for Mixture 88 TN $ 130.00 $11,440.00 <br />3 Tack Coat 400 GA $ 1.20 $ 480.00 <br />4 Crushed Rock 409 TN $ 12.00 $ 4-800.00 <br />Subtotal $37,160.00 <br />+ 10% Contingencies $ 3,720.00 <br />Total Estimated Construction Cost $40,880.00 <br />+ 20,% Engineering, Legal, Administration $ 8,120.00 <br />Total Estimated Project Cost $49,000.00 <br />-2- 9150-009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.