My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-16-89 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1980's
>
1989
>
05-16-89 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 7:22:30 PM
Creation date
10/2/2019 8:14:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ci r House. 162 Charles Avenue <br />St. Paul. Minnesota 55103 <br />° 612-222-0206 <br />May 19, 1989 <br />Dear Lake Elmo Homeowner, <br />Our firm is part of a research team which has been contracted by Washington <br />County to prepare an Environmental Impact Statement (EIS) on the landfill <br />inventory site in Lake Elmo. Please see the enclosed map. Washington County <br />is required to have the EIS prepared. <br />One aspect of this study is to interview homeowners near the landfill by Lake <br />Jane. We want to understand the effects of this earlier landfill before <br />projecting the effect of a landfill at Site G. <br />All interviews will be by phone. We will use a prepared set of questions <br />which have been reviewed by representatives of the city of Lake Elmo, Washington <br />County, and ReaPP. The main topics we will cover in the interview are: <br />1. Perceptions you have about your neighborhood and the neighborhood near <br />Site G. <br />2. Effects of the Lake Jane landfill and its cleanup on your family and <br />neighborhood: <br />a. Time spent <br />b. Nuisances caused <br />C. Satisfaction with outcome <br />d. Relationship with city and county. <br />3. Your current plans for your own property. <br />4. Changes to your plans which may have occurred because of the existing <br />landfill at Lake Jane. <br />5. Potential impacts on these plans you expect if the landfill at Site G is <br />built. <br />Interviews will be conducted during late May and early June. If you feel the <br />interview should be directed to someone other than yourself, please refer us <br />to that individual when we call. <br />Data that could identify you or your parcel will be kept by the consultant <br />only. This includes names :and any responses associated with those names. <br />Neither you nor your parcel will be specifically tied to responses in the <br />EIS. Only overall trends will be reported in the EIS. <br />If you need to talk to someone at Wa in to County about this survey, please <br />contact Tack Hansen at 779-5445� Cil ,,. <br />Thank you for your cooperation. <br />Sincerely, <br />John Genereux <br />John and Michele 6anereux <br />research consultants <br />in the social sciences <br />
The URL can be used to link to this page
Your browser does not support the video tag.