My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-03-90 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1990's
>
1990
>
04-03-90 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2025 7:00:37 PM
Creation date
10/2/2019 8:17:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR 30 190 14:35 T K D A & ASSOC'., INC. �� /7u � <br />. ,3 <br />TOLTZ,KING,,ANDEP9OM <br />TKDA ANDASSOCIATES, INCOPPORATF <br />b <br />2500 AMERICAN NATIONAL BANK BUILDING .. <br />ENGINEERS ARCHITECTS PLANNERS SAINT PAUL. MINNEBOTA55101 <br />61=02-Moo <br />PA%512012-Does <br />March 30, 1990 <br />Honorable Mayor and City Council <br />Lake Elmo, Minnesota <br />Re: SW-1 Public Water Supply <br />Lake Elmo, Minnesota <br />Commission No. 9150-010 <br />Dear Mayor and Council: <br />On March 22, a meeting was held with the Washington and Ramsey County representatives <br />regardhzg the Conceptual Design Public Water Supply for SW-1 dated February, 1990, Enclosed <br />is the review we prepared on the report and a list of the pertinent issues. The following is a <br />review of the meeting discussion: <br />Service Area The Counties see no justification for expanding the service area beyond that <br />which is proposed on the Conceptual Design Drawing No. 1. <br />t cneral Water System Design: TKDA will prepare a detailed design memorandum prior to the <br />next meeting outlining what we believe to be the important design parameters. <br />Operation and Maintenance Cost The Counties are not opposed to contributing toward 0 & M <br />costs for a limited amount of time if sufficiently justified. <br />Design, Construction and Qwner ft of the System; The Counties have no objection to the City <br />designing, constructing, and owning the public water supply. <br />Release fr rpm iability: The Counties will not seek any releases in exchange for the public water <br />supply. <br />The next meeting is scheduled for April 5 at 4:00 P.M. The issues seem to be reduced to <br />adequate system design and O & M contribution. <br />Sincerely, <br />Larry D. $ohrer, P.E. <br />LDl3/mha <br />Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.