Laserfiche WebLink
, <br />Minnesota Pollution -Control Agency <br />Landfill Cleanup Program <br />system. ,(Homes in the area are <br />January1993, a small on -site <br />would possibly be discontinued, <br />i <br />connected to a municipal water <br />shed exploded. In the fall of <br />If ground water quality does note <br />supply:) <br />1993, Washington County <br />improve, alternative forms of <br />installed an interim gas- <br />treatment would be evaluated. <br />Site Description and <br />extraction system on the western <br />The design, installation and <br />History <br />edge of the landfill to control <br />monitoring of the Washington.. <br />The WashingtonCounty Landfill <br />landfill as from moving off the <br />8 g <br />County Landfill cover system <br />operated as an MPCA permitted <br />site. <br />gas extraction system and <br />sanitary landfill from May 1969 <br />What are the MPCA's plans <br />- ground water pump out system <br />until May 19,75. The publicly- <br />for the Washington County <br />would be funded by the <br />owned landfill accepted mixed- <br />LandfillT <br />Minnesota Landfill Cleanup <br />municipal solid waste and <br />Program. <br />industrial waste. <br />The goals of the MPCA's plan are <br />1111981, the MPCA and <br />to install a new cover system and <br />Whatls the Landfill 1 <br />Washington County began <br />active gas -extraction system and <br />Cleanup Program? <br />testing ground water near the <br />to evaluate the current ground <br />The Landfill Cleanup Program <br />landfill site for contaminants. <br />water treatment system. <br />Was established by the <br />VOCs were detected in ground <br />The existing two -foot cover <br />Minnesota Legislature in 1994 to <br />water beneath the site and in the <br />system does not meet current <br />provide the state with the <br />private wells of two homes near <br />final.Cover requirements. Under <br />resources to investigate and <br />the site. In 1983, the Minnesota <br />the plan, the MPCA would install <br />conduct corrective actions at <br />Department of Heath (N4DH) <br />a cover system consisting of a <br />dosed landfills that are <br />issued drinking water advisories <br />geosynthetic membrane covered <br />Superfund sites or would likely <br />to those homes and supplied <br />by a sand -drainage layer and two <br />become so in the future. More , <br />bottled water to,the residents. <br />feet of cover soil: A better cover <br />than 1.00 dosed landfills qualify . <br />Homes in the area are now <br />would'improve runoff control at <br />for the program. <br />connected to a municipal water <br />the Washington County Landfill <br />The MPCA has developed <br />supply. <br />and reduce the productionof <br />priority list for qualified <br />1111983, a ground water pump- <br />leachate. <br />landfills. Nine landfills are <br />and -treat system was installed to <br />The plan calls for installing an <br />classified as high -priority sites <br />capture and treat contaminated <br />active gas -extraction system in <br />needing immediate action in <br />ground water at the site. Treated <br />the waste. Active gas -extraction <br />order to protect public health or <br />ground water is currently tested <br />wells would be installed and the <br />the environment. These. <br />by Washington County for <br />current barrier gas -extraction <br />landfills will be worked on this <br />contaminants and then sprayed <br />system would be turned off. The <br />year. <br />onto landfill property to be <br />new system would keep landfill <br />The Washington County <br />reabsorbed into the ground:, <br />gas from moving off the site and <br />Landfill is a high -priority site <br />Additional water is tested <br />reduce the explosion risk to <br />because of the continued risk <br />periodically and pumped into the <br />nearby buildings. <br />from ground water <br />Tri-Lake Watershed Outlet <br />through a ditch located west of <br />The MPCA would evaluate the <br />contaminationand the potential <br />the site. <br />impact of the cover and gas- , <br />for landfill gas to migrate off the <br />extraction system on the ground <br />site. <br />An investigation by MPCA staff <br />in August 1992 determined that <br />water quality. If ground water <br />quality improves, the ground <br />When Will construction be <br />landfill. gas standards were being <br />water pump -and -treat system <br />Completed? <br />exceeded on the western <br />The MPCA expects to begin. <br />perimeter of the landfill. hi <br />installation of the final cover <br />March 1995 <br />Page two <br />