My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-16-95 CCM
LakeElmo
>
City Council
>
City Council - Final Meeting Minutes
>
1990's
>
1995
>
05-16-95 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:28:41 PM
Creation date
10/2/2019 8:29:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{• <br />{ , , Minnesota Pollution Control Agency Landfill Cleanup" Program <br />and gas -extraction system in <br />August or September of this year. <br />Construction is expected to be <br />completed by the summer of <br />1996. Residents can expect to see <br />earth moving and excavation <br />equipment and a drill rig at the <br />site during this time period. The <br />MPCA does not anticipate that <br />garbage odor will be a problem: <br />How long will It take for all the gas to leave the <br />landfill? - <br />Landfills continue to produce <br />landfill. gas for many years after <br />they close. ,The length of time <br />landfill gas is produced depends <br />on the type of waste and amount <br />of moisture, among other factors, <br />in the landfill. The MPCA <br />anticipates the system will <br />operate for at:least 10 years. The <br />j need for continuing the system <br />will be evaluated on an ongoing <br />basis. <br />For more information about the <br />Washington County Landfill or <br />the Landfill Cleanup Program, <br />please call Dave Erickson, MPCA <br />Public Informationn Office at (612) <br />296-6605 or call toll free 1-800- <br />657-3864 (voice/TTY) <br />March 1995 Page three <br />
The URL can be used to link to this page
Your browser does not support the video tag.